Awards
Contract awards across defense and civilian agencies — who won, what for, and what it signals for the market.
-
Awards
W.S. Darley Added to $523M DLA Multiple-Award Contract for Fire and Emergency Vehicles
DLA Troop Support adds W.S. Darley and Company to an existing multiple-award contract with a $523 million ceiling for fire suppression and emergency response vehicles, providing the federal government's primary procurement vehicle for fire apparatus across military installations and federal agencies.
-
Awards
Ocean Ships Wins $1.1B Navy Contract to Operate Seven Oceanographic Survey Vessels
Military Sealift Command awarded Houston-based Ocean Ships a $1.1 billion firm-fixed-price contract to operate and maintain seven T-AGS oceanographic survey ships through 2032, structured as a total small business set-aside that drew three competing proposals.
-
Awards
SEACORP Wins $32M SBIR Phase III Contract to Develop Submarine Payload Control System Technology
SEACORP LLC received a $31.9 million SBIR Phase III sole-source contract from the Naval Undersea Warfare Center to develop payload control system technology for Navy submarines, with work spanning Rhode Island, multiple U.S. locations, and sites in the United Kingdom and Australia.
-
Awards
Amentum Wins $30M Contract to Modernize Return Basin Pump Infrastructure at Arnold AEDC
Amentum Technology secured a $30 million ceiling contract to replace pump assemblies and modernize infrastructure for the Return Basin at Arnold Air Force Base, Tennessee, home of the Arnold Engineering Development Complex.
-
Awards
Moog Military Aircraft Wins $25.9M Long-Term Navy Contract to Repair V-22 Osprey Bladefold Actuators
Moog Military Aircraft secured a $25.9 million long-term Navy contract to repair bladefold actuator components and power modules for the V-22 Osprey fleet, with work performed at its Torrance, California facility through May 2029.
-
Awards
Conti Federal Wins $36.3M Contract to Build B-21 Raider Flight Simulator Facility at Ellsworth AFB
Conti Federal Services won a $36.3 million design-bid-build contract to construct the B-21 Raider ADD Flight Simulator Phase 2 facility at Ellsworth Air Force Base, South Dakota, with completion scheduled for July 2028.
-
Advertisement
-
Awards
Air Force Awards $866M NASIC Advisory Services IDIQ to Apogee, KBR Wyle, Riverside Research, and SPA
The Air Force awarded an $866 million multiple-award IDIQ for advisory and assistance services at the National Air and Space Intelligence Center to Apogee Engineering, KBR Wyle Services, Riverside Research Institute, and Systems Planning and Analysis.
-
Awards
DSA Lands $193M Army eCAP Task Order for Cloud Modernization and AI-Enabled Defense Capabilities
Data Systems Analysts secured a $193 million five-year task order to continue modernizing Army intelligence cloud infrastructure and AI-enabled platforms under the Enterprise Cloud Analytics and Processing program, awarded via the RS3 contract vehicle.
-
Awards
Leidos Wins $2.7B Army Contract to Unify and Accelerate Hypersonic Weapons Production
The Army awarded Leidos a $2.7 billion contract on May 12, 2026, consolidating the Thermal Protection Shield and Common Hypersonic Glide Body programs into a single unified production effort to transition hypersonic weapons from prototyping to fielding.
-
Awards
Tyto Athene Wins $40M Fleet Cyber Command Shore-Based Equipment Installation and Support Contract
Tyto Athene LLC won a $40 million firm-fixed-price contract on May 12 from the Naval Information Warfare Systems Command to provide shore-based information technology equipment installation, configuration, and lifecycle support services for Fleet Cyber Command facilities across eight Navy regions.
-
Awards
Pine Bluff Sand and Gravel Wins $141M Army Corps IDIQ for Mississippi River System Maintenance Dredging
The Army Corps of Engineers' New Orleans District awarded Pine Bluff Sand and Gravel Co. a $141 million cost-plus-fixed-fee IDIQ through November 2029 for maintenance dredging — the contract that will keep the lower Mississippi River and Gulf Intracoastal Waterway navigable for the hundreds of millions of tons of cargo that move through the nation's most commercially vital waterway annually.
-
Awards
L3Harris Wins $77M Modification for Trident II D5 Flight Test Instrumentation Systems
Strategic Systems Programs awarded L3Harris Technologies — through its Interstate Electronics Corp. subsidiary — a $77.2 million cost-plus modification on May 1 to continue flight test instrumentation support for the Trident II D5 submarine-launched ballistic missile, the backbone of the U.S. and UK sea-based nuclear deterrent.