Awards
Contract awards across defense and civilian agencies — who won, what for, and what it signals for the market.
-
Awards
Central Maine Power Wins $44M NAVFAC Contract for Portsmouth Naval Shipyard Energy Infrastructure
NAVFAC Mid-Atlantic awards Central Maine Power a $44 million firm-fixed-price contract to upgrade substations, power distribution systems, metering, and energy services at Portsmouth Naval Shipyard in Kittery, Maine, with a decade-long completion window through 2036.
-
Awards
Young & Rubicam Navy Recruiting Ad Contract Grows to $663M Following New NAVSSC Modification
Naval Sea Systems Command awards Young & Rubicam a $84 million modification that raises the ceiling on the Navy's recruiting advertising IDIQ contract to $663.9 million, covering national media, digital, and recruitment marketing campaigns through the contract's ordering period.
-
Awards
Army Corps Awards $499M A-E IDIQ to 13 Firms for South Atlantic Military Design Work
USACE Mobile District awards a $499 million multiple-award architect-engineer IDIQ to 13 firms including AECOM, Arcadis-Exp Federal JV, and Burns & McDonnell for military design and construction services across the South Atlantic Division through May 2031.
-
Awards
General Dynamics Lands $229M Contract for 50 Stryker Double V-Hull A1 Vehicles
Army Contracting Command – Detroit Arsenal awards General Dynamics Land Systems a $229 million fixed-price incentive contract for 50 Stryker Double V-Hull A1 infantry carrier vehicles, with delivery from Sterling Heights, Michigan through June 2028.
-
Awards
Northrop Grumman Wins $325M Army Contract for RangeHawk High-Speed Test Resource
Army Contracting Command awards Northrop Grumman a $325 million cost-plus-fixed-fee contract to develop the RangeHawk universal payload architecture, a high-altitude long-endurance airborne test resource designed to collect data on hypersonic and high-speed weapon systems.
-
Awards
Northrop Grumman Awarded $398M Sole-Source OTA for Space Force SATCOM Development
Space Systems Command awards Northrop Grumman a $398 million firm-fixed-price contract for space vehicle development, launch, and on-orbit support for a classified SATCOM program, using sole-source authority under 10 U.S.C. § 4022.
-
Advertisement
-
Awards
Northrop Grumman Gets $196M NAVAIR Contract for MQ-4C Triton Logistics and ISR Support
NAVAIR awards Northrop Grumman a $196 million cost-plus-fixed-fee modification to provide logistics, field support, and intelligence reach-back services for the MQ-4C Triton maritime surveillance drone through May 2027.
-
Awards
Lockheed Martin Wins $991M NAVAIR Contract for F-35 Electronic Warfare Modification Kits
NAVAIR awards Lockheed Martin a $991 million firm-fixed-price contract for 432 electronic warfare modification kits across Air Force, Marine Corps, Navy, and foreign military sales variants of the F-35 Joint Strike Fighter.
-
Awards
BAE Systems Wins $535M Army Contract for Self-Propelled Howitzer Production
Army Contracting Command awarded BAE Systems Land and Armaments a $535.6 million fixed-price-incentive contract for production of self-propelled howitzer systems, vehicles, and total package fielding kits.
-
Awards
Point Blank Enterprises Wins $46M DLA Contract for Enhanced Small Arms Protective Inserts
DLA Troop Support awards Point Blank Enterprises a $46.4 million firm-fixed-price IDIQ for enhanced small arms protective inserts, the hard ceramic plates that provide rifle-round protection in military body armor systems, covering orders through November 2029.
-
Awards
COLSA Corp Wins $59M Navy IDIQ for Data Link Tactical Tool and Gateway Systems Engineering
NIWC Pacific awards COLSA Corporation a $59 million cost-plus-fixed-fee IDIQ for engineering services supporting the Navy's data link tactical tool, gateway systems, and mini-rack systems, spanning sites in San Diego and Huntsville through May 2031.
-
Awards
National Industries for the Blind Wins $44M Navy Mattress IDIQ Under AbilityOne Program
DLA Troop Support awards National Industries for the Blind a $44.8 million firm-fixed-price IDIQ for innerspring mattresses for the Navy, sourced through the AbilityOne mandatory source program that requires federal agencies to purchase covered products from nonprofits employing people who are blind or have other significant disabilities.