Awards
Contract awards across defense and civilian agencies — who won, what for, and what it signals for the market.
-
Awards
Leidos Wins $475M Air Force Contract to Sustain F-16 Avionics Worldwide
Leidos secured a $475M contract from Hill Air Force Base to provide product support integration for the F-16 Avionics Intermediate Shop program, covering USAF and allied air forces globally.
-
Awards
NASA Awards Nearly $1 Billion Across Four Companies for Moon Base Rovers and Landers
NASA selected Astrolab, Lunar Outpost, Blue Origin, and Firefly Aerospace for at least $907.4 million in confirmed task order awards for rovers, landers, and a drone carrier supporting three Moon Base missions planned for 2026.
-
Awards
Navy Awards $249.9M LIIS-CMDS Logistics IT Modernization IDIQ to 59 Firms
The Navy awarded the $249.9M LIIS-CMDS IDIQ to 59 of 72 offerors across two lots on June 11 to modernize logistics data integration and software capability for fleet readiness through 2031.
-
Awards
Precise Systems Wins $116.8M NSWC Crane Electronic Warfare Depot Contract
Precise Systems Inc. wins a $116.8M five-year contract from NSWC Crane to provide engineering, logistics, and depot-level sustainment for Navy and joint force airborne electronic attack warfare systems.
-
Awards
SpaceX Lands $2.29 Billion Space Force Contract for Military Satellite Data Backbone
SpaceX secured a $2.29 billion firm-fixed-price OTA delivery order to build the Space Data Network Backbone, a secure LEO constellation delivering low-latency data transport across the joint force, with a fully operational prototype required by end of 2027.
-
Awards
ICE Issues $50M–$100M Sole-Source Pre-Award Notice to TRM Labs for Crypto Analytics Support
ICE issued a June 10, 2026 pre-award notice for a sole-source award to TRM Labs worth $50M–$100M, covering blockchain analytics and cybercrime support for the Homeland Security Task Force Cyber Disruption Center.
-
Advertisement
-
Awards
Boeing Withdraws From Navy UJTS Jet Trainer Competition, Leaving Textron and SNC in $2.7B T-45 Replacement Race
Boeing withdrew from the Navy's $2.7B UJTS competition in June 2026, citing engine qualification timelines for the T-7A Red Hawk. Textron Aviation Defense and SNC remain as the only two competitors to replace the T-45 Goshawk.
-
Awards
Air Force to Begin FAMM Cruise Missile Production in September, Eyes 28,000 Units Over Five Years With Anduril and CoAspire
Air Force Chief of Staff Gen. Kenneth Wilsbach confirmed September 2026 production start for the Family of Affordable Mass Missiles, with FY2026 funding already covering the first 1,000 rounds and a five-year plan to procure nearly 28,000 weapons.
-
Awards
Saronic and Castelion to Arm 180-Foot Autonomous Warship With Hypersonic Missiles in First-Ever Maritime Launch Demo
Saronic and Castelion announced June 11 they will integrate Castelion's Blackbeard hypersonic vehicle onto the 180-foot Marauder MUSV — the first hypersonic system ever mounted on an autonomous surface vessel — with a maritime launch demo planned for 2027.
-
Awards
Pentagon Validates CACI's SkyValor as Joint-Force Counter-Drone Platform After Border Testing at MCAS Yuma
The Pentagon has validated CACI International's SkyValor counter-UAS system for deployment across the entire Joint Force following a two-day evaluation at Marine Corps Air Station Yuma in mid-May 2026. No contract value was disclosed.
-
Awards
Noblis Wins $309M NIWC Pacific C4ISR IDIQ for Navy Network Integration Engineering Facility
Noblis secured a $309M, 5-year single-award IDIQ from NIWC Pacific to deliver C4ISR systems engineering and lifecycle support for the Navy's Network Integration Engineering Facility — the firm's third successive win on this contract line.
-
Awards
Oracle Wins $396M OPM Contract to Overhaul Federal HR Systems Serving 2 Million Employees
Oracle Corporation secured a $395.8 million, 10-year contract from OPM to replace 100+ legacy HR systems under the Federal HR 2.0 program, consolidating human capital management for roughly 2 million federal civilian employees. A protest window remains open for Workday.