Anduril
Every GovConFeed story on Anduril — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Army Selects Anduril and Palantir to Lead NGC2 Common Data Layer, Moving Command-and-Control Modernization From Prototype to Production
The Army announced Anduril Industries as lead for the Next Generation Command and Control common data layer baseline, partnering with Palantir and Raft to provide an edge-to-cloud data mesh that will scale to all 11 Army divisions over five years.
-
Awards
Anduril Unveils ArsenalOS as Digital Backbone of Arsenal-1 Factory — Software Links Design to Mass Production of Fury, Roadrunner, Barracuda on Same Floor
Anduril launched ArsenalOS, a unified software platform managing design, production, supply chain, and sustainment across its Arsenal-1 campus near Columbus, Ohio, where Roadrunner, Barracuda, and YFQ-44A Fury are produced on the same reconfigurable floor.
-
Awards
Anduril Wins $363M CBP Contract for 200+ AI-Powered Extended Range Sentry Towers Capable of Tracking Targets at 7.5 Miles
U.S. Customs and Border Protection awarded Anduril Industries a $363 million contract for more than 200 Extended Range Sentry Towers, each standing 80 feet tall and detecting targets at a 12-kilometer range, expanding a border surveillance partnership dating to 2019.
-
Policy
Defense Tech VC Funding Hits $14.6B in Five Months as Pentagon Courts Private Capital
Defense tech VC funding hit $14.6B in the first five months of 2026, topping the 2025 full-year record of $9.6B, as the Pentagon credited a deliberate strategy to recruit private equity and venture capital into the defense industrial base.
-
Awards
Air Force Awards Anduril and General Atomics Production Contracts for First Operational CCA Drone Wingmen
Air Force picked Anduril (FQ-44A Fury) and General Atomics (FQ-42A Dark Merlin) for the first CCA production contracts June 17, 2026, bypassing Boeing, Lockheed Martin, and Northrop Grumman. Three production lots target 150 aircraft by decade-end at under $30M per unit.
-
Awards
CBP Awards Anduril $363 Million for AI-Enabled Extended Range Sentry Towers Along Southwest Border
CBP awarded Anduril $363M for 200+ autonomous Extended Range Sentry Towers on the southwest border. Awarded December 2025, publicly disclosed June 12, 2026; 40+ units already delivered.
-
Awards
Air Force to Begin FAMM Cruise Missile Production in September, Eyes 28,000 Units Over Five Years With Anduril and CoAspire
Air Force Chief of Staff Gen. Kenneth Wilsbach confirmed September 2026 production start for the Family of Affordable Mass Missiles, with FY2026 funding already covering the first 1,000 rounds and a five-year plan to procure nearly 28,000 weapons.
-
Awards
State Department Approves $1.98B Anduril Counter-Drone Sale to Kuwait After Iran Airport Strike
The State Department approved a $1.98B Foreign Military Sale of Anduril counter-drone systems to Kuwait days after Iran struck Kuwait International Airport, killing one person and injuring more than 60.
-
Policy
Army's FY2027 Budget Requests $994M for Counter-Drone Systems — a 195% Surge — With Raytheon, AeroVironment, and Anduril in the Mix
The Army's FY2027 budget requests $994M for counter-small unmanned aircraft systems, a 195% jump from $336M in FY2026, with investments spanning Raytheon's Coyote interceptors, AeroVironment's Freedom Eagle, and Anduril's Anvil autonomous platform.
-
Awards
Pentagon Awards Framework Contracts to Anduril, Leidos and Two Others for 10,000 Low-Cost Cruise Missiles
The Defense Department reached framework agreements with four vendors — Anduril, Leidos, CoAspire, and Zone 5 — to procure at least 10,000 low-cost containerized cruise missiles within three years, with test flights beginning June 2026.
-
Awards
Space Force Awards $3.2 Billion to 12 Companies to Prototype Golden Dome Space-Based Interceptors
Space Systems Command awarded 20 Other Transaction Authority contracts worth up to $3.2 billion to 12 companies — including SpaceX, Anduril, Lockheed Martin, and Northrop Grumman — to develop space-based interceptors for the Golden Dome missile defense architecture.
-
Awards
Anduril Lands $100M Space Force Contract Modification to Double SDANet Space Surveillance Mesh
Space Systems Command expanded Anduril's SDANet contract ceiling from $99.7M to $200M, funding the next phase of a Lattice-powered mesh network connecting Space Surveillance Network sensors worldwide.