BAE Systems
Every GovConFeed story on BAE Systems — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Pentagon Lines Up Seven Years of APKWS Kits From BAE, Up to 25,000 a Year
The Department of War and BAE Systems signed a framework for up to 25,000 APKWS guidance sections a year for up to seven years, pending congressional funding, with a path to 35,000 a year for allies through Foreign Military Sales. No dollar value was disclosed; a multiyear contract is still being negotiated.
-
Awards
Space Force Taps BAE for Jam-Resistant, Ultra-Compact RF Terminals on a Space Data Layer
Space Systems Command has tapped BAE Systems to design and demonstrate ultra-compact, jam-resistant RF terminals for a space-based data layer, built on BAE's space-hardened software-defined radios and meant to work from LEO to GEO. No contract value or terminal count was disclosed.
-
Awards
$230.1M Marine Corps Order Puts 32 ACV Recovery Vehicles Into BAE Production
The Marine Corps put 32 ACV recovery variants into full-rate production with a $230.1M firm-fixed-price modification to BAE Systems, fully obligated with FY2026 funds. Palfinger cranes get integrated at Anniston Army Depot, and the contract ceiling now stands at about $4.096B.
-
Awards
F-35 Block 4 Electronic Warfare for Lots 20-22 Goes to BAE Under Lockheed Subcontract
Lockheed Martin picked BAE Systems to build AN/ASQ-239 Block 4 electronic warfare systems for F-35 Lots 20-22 and to retrofit older jets. BAE declined to disclose the value; prior F-35 EW awards ran $493M (2021) and $491M (2023).
-
Awards
$49.3M Repair Contract Sends USS Wichita Back to Dry Dock Months After Last Overhaul
BAE Systems wins a sole-source $49.3M contract for USS Wichita's FY2026 docking availability, just months after the Freedom-class ship completed a 26-month repair following a 2022 propulsion mishap that nearly led to its early retirement.
-
Awards
General Atomics Joins Army's Three-Way Extended-Range Artillery Race With 74-Mile Projectile After Successful Yuma Test
The Army announced a contract for General Atomics Electromagnetic Systems under the Extended Range Artillery Projectile program, adding a third competitor alongside General Dynamics and BAE Systems in a race to field a 155mm guided round capable of hitting targets beyond 65 kilometers.
-
Awards
Army Names BAE Systems ROOK as Program of Record for Soft-Kill Active Protection, Awards $20M First Phase
The Army has designated BAE Systems' ROOK soft-kill active protection system as a program of record, awarding a $20 million first phase to the system that defeats missiles and drones by jamming or confusing them before they reach vehicles.
-
Awards
Air Force Opens Dedicated EPAWSS Speedline at Warner Robins to Accelerate F-15E Electronic Warfare Upgrades Outside Normal Depot Cycle
The Air Force Life Cycle Management Center launched an EPAWSS Speedline at Warner Robins Air Logistics Complex on May 26, 2026, enabling 99 F-15E Strike Eagles to receive the AN/ALQ-250 electronic warfare suite years ahead of their scheduled depot maintenance.
-
Awards
BAE Systems Wins $17.5M Navy Modification for USS Iwo Jima Selected Restricted Availability in Norfolk
The Mid Atlantic Regional Maintenance Center awarded BAE Systems Norfolk Ship Repair a $17.5 million modification for the USS Iwo Jima's FY26 Selected Restricted Availability, continuing the Wasp-class amphibious assault ship's maintenance period in Norfolk through May 2028.
-
Awards
BAE Systems Wins $535M Army Contract for Self-Propelled Howitzer Production
Army Contracting Command awarded BAE Systems Land and Armaments a $535.6 million fixed-price-incentive contract for production of self-propelled howitzer systems, vehicles, and total package fielding kits.