Boeing
Every GovConFeed story on Boeing — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Boeing Beats Lockheed for $2B Space Force Contract to Build Two Next-Generation MUOS Narrowband Satellites
Space Force selected Boeing over Lockheed Martin for a $2 billion fixed-price-incentive contract to design, develop, and produce two Mobile User Objective System Phase II satellites, the first competitive narrowband SATCOM production award Boeing has won from the service.
-
Awards
Boeing Wins $121M Navy Order to Install Increment 3 Block 2 Upgrades on Six U.S. and Three Australian P-8A Poseidon Aircraft
The Navy awarded Boeing a $121M cost-plus-fixed-fee order on June 22, 2026, for Increment 3 Block 2 A-kit retrofits on six U.S. Navy and three Royal Australian Air Force P-8A Poseidon maritime patrol aircraft, with work running through May 2029.
-
Awards
Boeing Wins $880M Navy IDIQ to Train P-8A Poseidon Crews Across Nine Allied Nations
The Navy awarded Boeing an $880M IDIQ on June 18, 2026, for P-8A Poseidon aircrew and maintenance training systems covering 12 locations across nine allied nations. The five-year contract runs through June 2031 and spans Australia, the UK, Germany, South Korea, Norway, New Zealand, Canada, and Singapore.
-
Awards
Air Force Awards Anduril and General Atomics Production Contracts for First Operational CCA Drone Wingmen
Air Force picked Anduril (FQ-44A Fury) and General Atomics (FQ-42A Dark Merlin) for the first CCA production contracts June 17, 2026, bypassing Boeing, Lockheed Martin, and Northrop Grumman. Three production lots target 150 aircraft by decade-end at under $30M per unit.
-
Awards
Boeing Withdraws From Navy UJTS Jet Trainer Competition, Leaving Textron and SNC in $2.7B T-45 Replacement Race
Boeing withdrew from the Navy's $2.7B UJTS competition in June 2026, citing engine qualification timelines for the T-7A Red Hawk. Textron Aviation Defense and SNC remain as the only two competitors to replace the T-45 Goshawk.
-
Awards
Boeing Wins $200M AFRL IDIQ for Aerospace Vehicle Technology R&D
Boeing won a competitively awarded $200M indefinite-delivery/indefinite-quantity contract from the Air Force Research Laboratory for multidisciplinary aerospace vehicle technology research, integration and transition, with work in St. Louis through May 2037.
-
Awards
Boeing Wins $854.7M P-8A Poseidon Lot 13 Modification for Four Foreign Military Sales Aircraft
Boeing received an $854,672,911 NAVAIR contract modification for P-8A Poseidon Lot 13, covering four aircraft for Foreign Military Sales customers plus DMSMS engineering, software integration, and hardware updates. FMS funds cover $852.6M; work runs through September 2030.
-
Awards
Air Force Opens Dedicated EPAWSS Speedline at Warner Robins to Accelerate F-15E Electronic Warfare Upgrades Outside Normal Depot Cycle
The Air Force Life Cycle Management Center launched an EPAWSS Speedline at Warner Robins Air Logistics Complex on May 26, 2026, enabling 99 F-15E Strike Eagles to receive the AN/ALQ-250 electronic warfare suite years ahead of their scheduled depot maintenance.
-
Awards
Boeing Wins $396M Army Contract for Final CH-47F Block I Chinook Production Run for South Korea and Spain
The Army definitized a $396.8 million modification to produce 19 CH-47F Block I Chinook helicopters for foreign military sales -- 18 for South Korea and one for Spain -- in what Boeing and the Army describe as the final Block I production run before transitioning to the improved Block II configuration.
-
Awards
Boeing Wins $251M Sole-Source Navy Contract to Deliver P-8A Poseidon Training Systems for Germany
NAVAIR sole-sourced a $251 million contract to Boeing to design and field a complete P-8A Poseidon training ecosystem for the German Navy at Nordholz, covering tactics trainers, maintenance trainers, electronic classrooms, and mission systems trainers, with a cost-sharing provision for Canada's future P-8A training system.
-
Awards
Boeing Gets $125M More for Air Force One Spare Parts as New VC-25B Nears 2028 Delivery
The Air Force Life Cycle Management Center added $125M to Boeing's VC-25B contract for initial long-lead spare parts, pushing the Air Force One replacement program past $4.4B as a bridge test aircraft completed ground testing in May.
-
Awards
B-52J Clears Critical Design Review — Boeing Begins $2B Engine Swap at San Antonio This Year
The B-52 Commercial Engine Replacement Program passed its Critical Design Review in early May 2026, clearing the path for Boeing to begin modifying the first two aircraft at its San Antonio facility later this year. Rolls-Royce F130 engines will replace 1960s-era TF33s on all 76 bombers.