Boeing
Every GovConFeed story on Boeing — contract awards, policy, enforcement, and protests, newest first.
-
Awards
$2.82B KC-46 Lot 13 Closes Out Boeing's Original Tanker Contract as Price Climbs 14%
The Air Force ordered 15 KC-46A Lot 13 tankers from Boeing for $2.82 billion, the final lot under the 2011 contract and more than 14% above Lot 12. A 75-jet follow-on hinges on Boeing fixing deficiencies.
-
Awards
SOCOM Orders $197.3M More Boeing MH-47G Chinooks, With Deliveries Running to 2031
U.S. Special Operations Command placed a $197.3 million firm-fixed-price order modification with Boeing's Ridley Park, Pa., plant for MH-47G rotary-wing aircraft, fully obligated from fiscal 2027 Defense-wide and Army aircraft procurement funds, with work running to September 2031. The listing does not give an aircraft count.
-
Awards
Navy T-45 Replacement Down to One Bidder as SNC Exits UJTS, Leaving Textron-Leonardo M-346N
Sierra Nevada Corporation skipped the Oct. 30 UJTS proposal deadline, saying it could not responsibly bid under the current contract structure. That leaves Textron Aviation Defense and Leonardo's M-346N as the only known bidder for up to 216 Navy trainer jets, with an award now planned for the fourth quarter of fiscal 2027.
-
Awards
$945.9M Boeing MILSATCOM Sustainment Deal Goes Sole-Source Over Data Rights
Space Systems Command plans a sole-source award worth up to $945.9M to Boeing to sustain WGS and UFO satellites and ground systems, saying Boeing has repeatedly refused to sell the data rights other contractors would need. Comments are due Nov. 17.
-
Awards
$90.8M Navy Order Keeps Bell Boeing Rebuilding the V-22 Osprey's Flight Control Computers
Naval Air Systems Command placed a $90.8M sole-source order with the Bell Boeing Joint Project Office to continue redesigning V-22 Osprey flight control computers, cockpit interface units and test equipment through October 2030, with $4.87M obligated at award.
-
Awards
Israel Signs for 12 Boeing AH-64E Apaches After Cabinet Vote Rescues Deal Past Missed U.S. Deadline
Israel signed for 12 Boeing AH-64E Apaches on Oct. 14 after missing an Oct. 7 U.S. deadline. An emergency Cabinet phone vote diverted NIS 1 billion (about $288M), mostly from a five-year plan for Arab society, over Finance Minister Smotrich's objection.
-
Awards
$14.7B Lockheed Order Lets Boeing Triple PAC-3 MSE Seeker Output
Lockheed Martin awarded Boeing an undefinitized contract action worth about $14.7 billion to triple PAC-3 MSE seeker production under a seven-year Pentagon framework, backing the Patriot interceptor surge and adding hundreds of jobs around Huntsville, Ala.
-
Awards
Air Force Books 22 F-15EX Fighters From Boeing for $2.38B Before Reconciliation Money Expired
The Air Force obligated reconciliation funds before the Sept. 30 deadline to buy 22 F-15EX Eagle II fighters from Boeing in Lot 7 for $2.38 billion, bringing the program to 120 contracted aircraft across Lots 1 through 7.
-
Awards
Navy Picks Boeing for F/A-XX Carrier Fighter in $20B-Plus Development Deal
The Pentagon says the F/A-XX full-scale development contract is worth more than $20B. Boeing will build the Navy's first sixth-generation carrier fighter, its second such win after the Air Force F-47, and outlets differ on why it beat Northrop Grumman.
-
Awards
Federal Contract Spending Is Up 22.5% Through May. Nearly a Third of the Increase Is at Homeland Security.
A GovConFeed analysis of USAspending.gov records finds agencies obligated $520.9 billion on contracts from October through May, $95.8 billion more than in the same eight months a year earlier. Customs and Border Protection went from $1.9 billion to $25.7 billion.
-
Awards
$49.5M Boeing Deal Keeps AGM-86B Nuclear Cruise Missiles Flying Through 2033
The Air Force Nuclear Weapons Center awarded Boeing a sole-source IDIQ to remanufacture up to 550 Elevon Actuator Controllers for the AGM-86B nuclear cruise missile, sustaining the aging weapon aboard B-52 bombers through June 2033.
-
Awards
Air Force Builds $471M KC-46 Parts Pool Across 28 Firms to Unclog Pegasus Supply Chain
The Air Force Sustainment Center awarded a maximum $470,978,031 IDIQ to 28 companies for exchange or repair of KC-46 aircraft parts, a competitive award framed as a fix for the Pegasus tanker's parts supply problem. Work runs through May 2031.