Huntington Ingalls Industries
Every GovConFeed story on Huntington Ingalls Industries — contract awards, policy, enforcement, and protests, newest first.
-
Awards
£142M Royal Navy Mine-Hunting Deal Brings HII REMUS 620 Drones to the Fleet
The UK MoD is spending £142 million (about $186 million) on HII REMUS 620 underwater drones, Sea Launcher systems and UK-based support for the Royal Navy Mine-Hunting Capability program, an award HII calls its largest international unmanned order.
-
Awards
Ingalls Hands Eastern Shipbuilding Cabling Work on DDG 139 Destroyer Grand Blocks
Eastern Shipbuilding Group will build outfitted grand blocks for the future USS Telesforo Trinidad (DDG 139) under an Ingalls agreement finalized Oct. 2, adding cabling to its scope. A separate Nov. 4 release covers six LPD 32 units. No dollar value was disclosed.
-
Awards
Navy Orders 82 More Lionfish Undersea Drones From HII in $347M Program
The Navy exercised options for 82 more HII Lionfish small unmanned undersea vehicles, bringing the REMUS 300-based program to 175 vehicles, with room for 200, under a five-year contract worth more than $347 million.
-
Awards
$53.9M Navy Remote Mine Hunting Award Goes to Thales Unit AAC, With Options to $196.2M
Thales subsidiary Advanced Acoustic Concepts will build two Remote Mine Hunting modules for the Navy under a $53.9M contract, pairing SAMDIS 600 synthetic aperture sonar with AI target recognition. Options could lift the value to about $196.2M, with first deliveries due by October 2029.
-
Awards
$99M Navy Modification Sends Hypersonic-Bound USS Lyndon B. Johnson to Sea Trials at Ingalls
HII's Ingalls Shipbuilding received a $99 million Navy contract modification for combat-system testing and sea trials on the Zumwalt-class USS Lyndon B. Johnson (DDG 1002), the Navy's second Conventional Prompt Strike platform, in the final phase of the Navy's multi-stage delivery strategy at Ingalls.
-
Awards
$56M Navy Contract Puts Newport News Engineers on SSN-AUKUS Submarine Design
HII's Newport News Shipbuilding won a $56 million Navy contract, with an option up to $91 million, to support AUKUS engineering, Foreign Military Sales work for the UK and Australia, and design of the SSN-AUKUS nuclear-powered submarine.
-
Awards
$5.1B Truman Carrier Overhaul Goes to HII Without Competition
The Navy awarded Huntington Ingalls a $5.1 billion fixed-ceiling incentive contract to refuel and overhaul USS Harry S. Truman at Newport News. The award was sole-source, work runs to November 2031, and $547.8 million was obligated at award.
-
Awards
Navy Buys 30 Medium Unmanned Surface Vessels at About $40M Each After At-Sea Trials
The Navy will buy 30 medium unmanned surface vessels, 10 each from Galliano Marine Services, HII and Saronic, at an average of about $40 million apiece. Three more vendors get $15 million prototype payments and a place in the Drones.mil marketplace.
-
Awards
HII Wins $418M Navy IDIQ for Aircraft Carrier and Amphibious Ship Elevator Maintenance Through 2031
Huntington Ingalls Industries Mission Technologies Corp. was awarded a $417.7M cost-plus-fixed-fee IDIQ by NAVSEA on June 15, 2026, for elevator support unit maintenance and repair on U.S. Navy aircraft carriers and amphibious ships through June 2031.
-
Awards
Navy Gives BlueForge Alliance Another $400M to Strengthen the Submarine Industrial Base
Naval Sea Systems Command awarded BlueForge Alliance (Bryan, TX) a $400M firm-fixed-price contract modification to support and uplift the Submarine Industrial Base through September 2027, pushing the organization's cumulative DoD funding past $1.5 billion.
-
Awards
BAE Systems Wins $17.5M Navy Modification for USS Iwo Jima Selected Restricted Availability in Norfolk
The Mid Atlantic Regional Maintenance Center awarded BAE Systems Norfolk Ship Repair a $17.5 million modification for the USS Iwo Jima's FY26 Selected Restricted Availability, continuing the Wasp-class amphibious assault ship's maintenance period in Norfolk through May 2028.
-
Awards
HII Wins $220M Navy IDIQ Modification for Aircraft Carrier Engineering and Maintenance Support
The Navy awarded Huntington Ingalls Industries Fleet Support Group a $220.7 million IDIQ modification on May 13 to continue aircraft carrier engineering, maintenance, and lifecycle support work through February 2027 at CONUS, overseas, and forward-deployed locations.