U.S. Air Force
Every GovConFeed story on U.S. Air Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
IAP World Services Wins $92M to Replace Deteriorating Radomes on North Warning System Radar Network
The Air Force Life Cycle Management Center awarded IAP World Services two contracts totaling $92 million to replace structurally deteriorating radomes on the AN/FPS-117 long-range and AN/FPS-124 gap-filler radars that guard North American airspace against polar approaches, with work spanning sites in Alaska, Canada, Hawaii, Utah, and Florida.
-
Awards
Geost Wins $89.5M Space Systems Command Modification for Oculus Host Satellite Program
Space Systems Command awarded Geost LLC an $89.5 million contract modification for the Oculus Host program — a classified or restricted satellite program supporting national security space operations.
-
Awards
World Wide Technology Lands $40M AI-Powered SOC Contract With Air Combat Command
World Wide Technology secured a $40 million contract to deliver an AI-enhanced Security Operations Center for Air Combat Command, integrating machine learning threat detection with existing Air Force cyber infrastructure.
-
Awards
Lockheed Martin Wins $879M F-35 Armament Contract for Lots 18 and 19
The Pentagon awarded Lockheed Martin a $879 million modification for F-35 armament integration covering production Lots 18 and 19, continuing the program's decade-long weapons modernization track.
-
Awards
Ansys Government Wins $82M AFTC Contract for Simulation Software at Edwards AFB
The Air Force Test Center awarded Ansys Government Initiatives an $82 million indefinite-delivery/indefinite-quantity contract for software licenses and ancillary engineering services, including modeling and simulation, at Edwards Air Force Base.
-
Awards
Army Corps Awards $499M A-E IDIQ to 13 Firms for South Atlantic Military Design Work
USACE Mobile District awards a $499 million multiple-award architect-engineer IDIQ to 13 firms including AECOM, Arcadis-Exp Federal JV, and Burns & McDonnell for military design and construction services across the South Atlantic Division through May 2031.
-
Awards
Lockheed Martin Wins $991M NAVAIR Contract for F-35 Electronic Warfare Modification Kits
NAVAIR awards Lockheed Martin a $991 million firm-fixed-price contract for 432 electronic warfare modification kits across Air Force, Marine Corps, Navy, and foreign military sales variants of the F-35 Joint Strike Fighter.
-
Awards
Amentum Wins $30M Contract to Modernize Return Basin Pump Infrastructure at Arnold AEDC
Amentum Technology secured a $30 million ceiling contract to replace pump assemblies and modernize infrastructure for the Return Basin at Arnold Air Force Base, Tennessee, home of the Arnold Engineering Development Complex.
-
Awards
Moog Military Aircraft Wins $25.9M Long-Term Navy Contract to Repair V-22 Osprey Bladefold Actuators
Moog Military Aircraft secured a $25.9 million long-term Navy contract to repair bladefold actuator components and power modules for the V-22 Osprey fleet, with work performed at its Torrance, California facility through May 2029.
-
Awards
Conti Federal Wins $36.3M Contract to Build B-21 Raider Flight Simulator Facility at Ellsworth AFB
Conti Federal Services won a $36.3 million design-bid-build contract to construct the B-21 Raider ADD Flight Simulator Phase 2 facility at Ellsworth Air Force Base, South Dakota, with completion scheduled for July 2028.
-
Awards
Air Force Awards $866M NASIC Advisory Services IDIQ to Apogee, KBR Wyle, Riverside Research, and SPA
The Air Force awarded an $866 million multiple-award IDIQ for advisory and assistance services at the National Air and Space Intelligence Center to Apogee Engineering, KBR Wyle Services, Riverside Research Institute, and Systems Planning and Analysis.
-
Awards
Alaska Native Firm Goldbelt Apex Wins $73.6M Air Force Contract to Maintain War Reserve Materiel Stocks
The 773rd Enterprise Sourcing Squadron at Joint Base San Antonio awarded Goldbelt Apex LLC a $73.6 million firm-fixed-price contract to maintain Air Force War Reserve Materiel at CONUS sites through January 2029 — a logistics sustainment award that highlights the ANC contracting model in Air Force supply chain programs.