U.S. Air Force
Every GovConFeed story on U.S. Air Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
$66.6M DLA Contract Locks In Extreme-Environment Combat Ration Enhancements for All Four Military Branches Through 2031
Defense Logistics Agency Troop Support awarded Baxters North America a $66.6M five-year fixed-price IDIQ for Modular Operational Ration Enhancement packages serving Army, Navy, Air Force, and Marine Corps personnel in extreme cold and hot environments through June 2031.
-
Awards
Boeing Wins $121M Navy Order to Install Increment 3 Block 2 Upgrades on Six U.S. and Three Australian P-8A Poseidon Aircraft
The Navy awarded Boeing a $121M cost-plus-fixed-fee order on June 22, 2026, for Increment 3 Block 2 A-kit retrofits on six U.S. Navy and three Royal Australian Air Force P-8A Poseidon maritime patrol aircraft, with work running through May 2029.
-
Protests
GAO Denies Altus Technology Solutions Protest of $91M Air Force Training Range Award to VetPride-EMI, Ruling Price-Level Evaluation Was Lawful
GAO denied Altus Technology Solutions’ protest of a $91M Air Force training range contract awarded to VetPride-EMI Maintenance Solutions, rejecting all four grounds including program management evaluation, price scrutiny, best-value tradeoff, and SAM registration errors.
-
Awards
Air Force Awards Anduril and General Atomics Production Contracts for First Operational CCA Drone Wingmen
Air Force picked Anduril (FQ-44A Fury) and General Atomics (FQ-42A Dark Merlin) for the first CCA production contracts June 17, 2026, bypassing Boeing, Lockheed Martin, and Northrop Grumman. Three production lots target 150 aircraft by decade-end at under $30M per unit.
-
Enforcement
B-52 Crash at Edwards Kills 8—Including Two Boeing Employees—During AN/APQ-188 Radar Test
A B-52H crashed June 15, 2026 at Edwards AFB, killing all eight aboard—including two Boeing employees—during an AN/APQ-188 AESA radar test. The aircraft was the first in the fleet to receive the upgrade under the B-52J modernization program, which had already slipped three years.
-
Policy
AFRL Closes Industry Feedback Window on Revived $10B AMAC R&D IDIQ After Cancelling Original Solicitation Over Acquisition Strategy Flaws
AFRL closed its industry feedback window June 15, 2026, on the revised draft solicitation for the $10B AMAC IDIQ—an S&T R&D vehicle for Air Force and Space Force—after cancelling the original solicitation in April 2026 over acquisition strategy flaws.
-
Awards
Dell Federal Secures $1.44B Air Force Call Order to Renew Microsoft 365 Enterprise Licenses Through 2029
Dell Federal Systems was awarded a $1,437,934,084 firm-fixed-price call order on June 15, 2026, to renew Microsoft 365 enterprise licenses for the Air Force through April 30, 2029. The Air Force Life Cycle Management Center issued the sole-source award under BPA N66001-26-A-0051.
-
Policy
Pentagon Asks Congress to Gut McCain-Era Revolving Door Rules for Mid-Grade Officials in FY2027 NDAA
The Pentagon submitted a FY2027 NDAA proposal in June 2026 to eliminate one-year post-service lobbying cooling-off periods for O-7/O-8 officers and narrow all remaining restrictions to only the specific department office where former officials served.
-
Awards
Top Flight Aerostructures Wins $53M DLA Contract for B-1 Trailing Edge Components
Top Flight Aerostructures Inc. of Dallas, Georgia has been awarded a $53,078,535 firm-fixed-price IDIQ contract by the Defense Logistics Agency for B-1 Lancer aircraft trailing edge components, with a three-year performance period running through June 2029.
-
Awards
General Atomics-Integrated Intelligence Wins $49.7M AFRL Contract for GALAWAR Spectrum Geolocation Program
The Air Force Research Laboratory has awarded General Atomics-Integrated Intelligence Inc. a cost-plus-fixed-fee contract worth $49.7M for GALAWAR spectrum geolocation research at Wright-Patterson AFB, advancing AFRL's Sensors Directorate electromagnetic superiority programs.
-
Enforcement
U.S. Air Force Awards $400M Construction IDIQ to Seven Firms at Morón Air Base
The Air Force awarded a $400 million, ten-year indefinite-delivery/indefinite-quantity construction contract to seven firms for construction services at Morón Air Base in Spain, a critical U.S. Air Forces in Europe installation supporting the European and African commands.
-
Awards
Air Force Awards Nextgen Federal $14M to Embed AI Into BIFROST Weather Portal
The U.S. Air Force awarded Nextgen Federal a sole-source cost-type contract worth up to $14,081,185 to integrate artificial intelligence and machine learning capabilities into the BIFROST weather data command and control portal used by Air Force weather operations.