U.S. Air Force
Every GovConFeed story on U.S. Air Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
USfalcon Wins $84M Task Order for Air Force Nuclear Weapons Center Advisory Services at Offutt
The Air Force Nuclear Weapons Center awarded USfalcon Inc. an $84.3 million cost-plus-fixed-fee task order on May 4 for advisory services supporting nuclear weapons acquisition programs at Offutt Air Force Base — a high-value cleared services award reflecting the pace of Air Force nuclear modernization.
-
Awards
Northrop Grumman Wins $100M Sole-Source Air Force Contract for Stand-in Attack Weapon Seeker Components
Northrop Grumman secured a sole-source Air Force contract worth up to $100M for active seeker components, test and evaluation support, and science and technology development for the Stand-in Attack Weapon (SiAW) — an F-35A-compatible air-to-surface missile targeting enemy air defenses — with performance through December 2034.
-
Awards
Applied Research Associates Wins $111.5M Naval Research Laboratory High-Performance Computing IDIQ
Applied Research Associates landed a $111.5M IDIQ from the Naval Research Laboratory on May 8 for high-performance computing R&D support, including cryptographic capability development and network protocol design at the NRL's Washington, D.C. facility.
-
Awards
Planned Systems International Wins $110M AFSOC Mission Integration Contract at Hurlburt Field
The Air Force awarded Planned Systems International a $110M hybrid contract to sustain and modernize Air Force Special Operations Command's integrated mission systems, covering global maintenance, cybersecurity, and deployed support.
-
Awards
Boeing Gets $125M More for Air Force One Spare Parts as New VC-25B Nears 2028 Delivery
The Air Force Life Cycle Management Center added $125M to Boeing's VC-25B contract for initial long-lead spare parts, pushing the Air Force One replacement program past $4.4B as a bridge test aircraft completed ground testing in May.
-
Awards
Army Awards $49M NCODE Contract to Eight Firms in Bid to Shield Small Defense Suppliers From Cyberattacks
Eight small businesses won spots on the Army's five-year NCODE contract to provide CMMC and NIST SP 800-171 compliance support to DIB small businesses through a managed secure cloud enclave, beating out 31 competing proposals.
-
Awards
B-52J Clears Critical Design Review — Boeing Begins $2B Engine Swap at San Antonio This Year
The B-52 Commercial Engine Replacement Program passed its Critical Design Review in early May 2026, clearing the path for Boeing to begin modifying the first two aircraft at its San Antonio facility later this year. Rolls-Royce F130 engines will replace 1960s-era TF33s on all 76 bombers.
-
Awards
Marvin Engineering wins $138.2M Air Force requirements contract for AMRAAM launchers and power supplies (FMS)
May 1, 2026 firm-fixed-price requirements contract — components for fighter aircraft that carry and release AIM-120 AMRAAM, all for Foreign Military Sales partners. 10-year period of performance.
-
Awards
Boeing books $37.8M modification for F-15 Saudi advanced aircrew training device Phase II
May 1, 2026 firm-fixed-price modification keeps contractor logistics support flowing on the Royal Saudi Air Force F-15SA training simulator program. Cumulative contract value now $144.3M.
-
Awards
Iron Bow lands $100M Air Force IT modernization contract — software modernization support services
Firm-fixed-price contract from the 10th Contracting Squadron at the Air Force Academy, Colorado. $100M for software modernization support — consolidated hardware/software for training and asset management. Through April 2027 across CONUS and OCONUS sites.
-
Awards
Boeing wins $900M Air Force T-38C avionics life-cycle support — single bid, 10-year contract through 2036
March 31, 2026 award; competitive solicitation drew a single bid. Covers full life-cycle support of T-38C avionics across 9 specific bases. $56.2M FY2026 O&M obligated at award.
-
Awards
Raytheon books $2.01B Air Force AEHF terminal modification — nuclear C2 SATCOM through August 2031
March 13, 2026 modification by AFNWC Strategic Communications Division raises cumulative AEHF terminal work to ~$2.97B. Performance in Marlborough, MA and Largo, FL through Aug. 9, 2031. Terminals support nuclear command and control.