U.S. Air Force
Every GovConFeed story on U.S. Air Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
$38.8M Air Force Deal Keeps General Atomics Sustaining Taiwan's MQ-9B Fleet Through 2029
The Air Force has handed General Atomics Aeronautical Systems a $38.8 million sole-source Foreign Military Sale contract for contractor logistics support for Taiwan's MQ-9B SkyGuardian aircraft. The full amount was obligated at award, and work in Poway, California, runs through Aug. 31, 2029.
-
Awards
$90.8M Navy Order Keeps Bell Boeing Rebuilding the V-22 Osprey's Flight Control Computers
Naval Air Systems Command placed a $90.8M sole-source order with the Bell Boeing Joint Project Office to continue redesigning V-22 Osprey flight control computers, cockpit interface units and test equipment through October 2030, with $4.87M obligated at award.
-
Protests
Air Force's $1.9B Eglin EOMS II Award Back in Limbo After GAO Rejects 'Leak It to Everyone' Fix
GAO sustained Fluor and Reliance Test & Technology protests of the Air Force's $1.9 billion Eglin EOMS II award to Strategic Test Solutions, agreeing that sharing leaked pricing with every bidder compounded a Procurement Integrity Act violation instead of curing it.
-
Awards
$5.4B Air Force Adversary-Air Contract Adds Three Small Firms to CAF CAS
KestrelX, A2G International and Fleet Adversary Support and Training won spots on a $5.4B Air Force IDIQ for contracted adversary air and close air support through Oct. 2029. Only $3,000 was obligated at award, and none of the three appeared on the 2019 or 2024 CAF CAS winner lists.
-
Policy
Sentinel ICBM Review Reopens as Air Force Eyes Land for 120 New Silos
The Air Force opened a supplemental environmental review of the Sentinel ICBM program after abandoning plans to convert Minuteman III sites, and may buy land for up to 120 new silos near F.E. Warren, Malmstrom and Minot. A draft is due fall 2027, the final in spring 2028.
-
Awards
$99M Army IDIQ Moves Shift5 From NGC2 Prototype Partner to Program Component
Shift5 says a new Army IDIQ worth up to $99 million moves it from Anduril's NGC2 prototype team to a direct program component. The ceiling contract, awarded by Army Contracting Command at Aberdeen, runs to Sept. 2031.
-
Awards
$200M Army NGC2 Readiness Software Deal Goes to Air, Formerly Govini, Starting With I Corps
Air, formerly Govini, says the Department of War awarded it a potential five-year, $200 million contract to deliver NGC2 readiness software with Army and industry partners, starting with I Corps as the program moves from division prototyping to force-wide delivery.
-
Awards
Navy Lines Up Lockheed to Put LRASM on the B-52, Opening a 20-Missile Anti-Ship Bomber Option
NAVAIR plans to award Lockheed Martin work to integrate LRASM on the B-52, which already carries up to 20 JASSMs. The Oct. 7 notice covers software updates, testing, test asset repair and failure review boards; no price or schedule has been disclosed.
-
Policy
Pentagon GPS Backup Programs Need Consolidation, GAO Says, as Ground System Is Canceled
GAO says DOD should merge fragmented Army, Navy and Air Force GPS-backup programs as GPS modernization slips and the Next Generation Operational Control System is canceled, putting M-code receivers and munitions integration at risk.
-
Awards
$869M in Navy and Air Force Audit Work Goes to EY on Single Quotes
DFAS awarded Ernst & Young two labor-hour contracts worth up to $869.4M combined to audit Navy, Marine Corps and Air Force financial statements. Each competitive solicitation drew one quote; the Air Force deal succeeds EY's 2022 contract for the same work.
-
Awards
Air Force Books 22 F-15EX Fighters From Boeing for $2.38B Before Reconciliation Money Expired
The Air Force obligated reconciliation funds before the Sept. 30 deadline to buy 22 F-15EX Eagle II fighters from Boeing in Lot 7 for $2.38 billion, bringing the program to 120 contracted aircraft across Lots 1 through 7.
-
Awards
Air Force Puts $64.4M Into 'Swamp Gas' Balloon Prototype, Mission Undisclosed
The Air Force sole-sourced a $64,437,723 'Swamp Gas' prototype contract to Aerostar for a High-Altitude Balloon Operational Urgency. The notice names no mission, sponsor or payload, and work runs to March 23, 2028.