U.S. Air Force
Every GovConFeed story on U.S. Air Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
KTH Services JV Wins $221.5M Army Contract for Fort Carson Base Operations Support Through 2031
KTH Services JV LLC of Falls Church, Virginia, won a $221,500,000 firm-fixed-price Army contract for base operations support at Fort Carson, Colorado, through May 2031. The competitively solicited award drew five bids and marks the joint venture's second major BASOPS win.
-
Awards
SpaceX Wins $4.16 Billion Space Force Award to Build Space-Based Airborne Moving Target Indicator Constellation
The U.S. Space Force awarded SpaceX $4.16 billion under an Other Transaction Authority agreement to build a Starshield-based satellite constellation that detects and tracks airborne moving targets, with an initial operational capability targeted for 2028.
-
Awards
Lockheed Martin Wins $100.5M Order for 1,459 F-35 Brake Heat Sinks to Resolve Fleet Thermal Constraint
Lockheed Martin Aeronautics received a $100,455,916 firm-fixed-price order (N0001926F0266) from Naval Air Systems Command for 1,459 F-35 brake assembly heat sinks -- 1,075 for the F-35A and 384 for the F-35B -- to resolve a thermal management constraint. Work is in South Bend, Indiana, through March 2030.
-
Awards
DIU Triples Hermeus Contract to $219M as Quarterhorse Mach-3 Drone Shifts From Test Vehicle to Weapon System
The Defense Innovation Unit added $159 million to its Hermeus Quarterhorse contract, bringing the ceiling to $219 million, as the Mach-3 drone program officially pivots from a test asset to a weapon platform ahead of Mk 2.2 flight tests in 2026.
-
Policy
Space Force Requests $1B for Four Distributed Ops Centers After Operation Epic Fury Showed U.S. Space Assets Can Be Destroyed
The Space Force's record $17.3 billion FY2027 budget request includes $1 billion for four new distributed space operations centers, driven by lessons from Operation Epic Fury in which U.S. space capabilities were targeted and destroyed for the first time.
-
Awards
Air Force Opens Dedicated EPAWSS Speedline at Warner Robins to Accelerate F-15E Electronic Warfare Upgrades Outside Normal Depot Cycle
The Air Force Life Cycle Management Center launched an EPAWSS Speedline at Warner Robins Air Logistics Complex on May 26, 2026, enabling 99 F-15E Strike Eagles to receive the AN/ALQ-250 electronic warfare suite years ahead of their scheduled depot maintenance.
-
Awards
Data Monitor Systems Wins $26.4M DLA Energy Contract to Operate Fuel Services at Naval Air Station Key West
DLA Energy awarded Midwest City, Oklahoma-based Data Monitor Systems a $26.4 million contract to operate government-owned aircraft and ground fuel services at Naval Air Station Key West, covering fuel receipt, storage, distribution, and accounting for aviation fuels supporting SOUTHCOM and Atlantic Fleet operations.
-
Awards
CCI Group Wins $25.4M Contract to Build F-35 Mission Rehearsal Trainer Facility at Luke Air Force Base
The Air Force's 56th Contracting Squadron at Luke Air Force Base awarded CCI Group a $25.4 million construction contract to renovate Building 617 for F-35A Modified Mission Rehearsal Trainers, expanding simulation capacity at the world's largest F-35A training wing.
-
Awards
Parsons Wins $28.8M AFRL Task Order for Research, Development, and Engineering Support at Rome Information Directorate
The Air Force Research Laboratory's Information Directorate in Rome, New York awarded Parsons Government Services a $28.8 million task order for field site support spanning research, development, engineering, and maintenance operations at a facility that develops command-and-control, ISR, and cyber technologies.
-
Awards
Northrop Grumman Wins $49M Air Force Contract for Joint Threat Emitter Software Support
The Air Force Life Cycle Management Center at Hill Air Force Base awarded Northrop Grumman a $49 million cost-plus-fixed-fee contract on May 20 for software support for the Joint Threat Emitter program, which simulates adversary radar and missile threats to train pilots and electronic warfare crews.
-
Awards
Reinhart Foodservice Wins $75M Sole-Source DLA Troop Support Food Contract
Defense Logistics Agency Troop Support awarded Reinhart Foodservice a $75.1 million sole-source IDIQ for full-line food and beverage supply to all four military branches, citing only one responsible source available under FAR 6.302-1, with the contract running 273 days through February 2027.
-
Awards
Stephenson Stellar Wins $98M Sole-Source Engineering Support IDIQ for Air Force Global Strike Command
The Air Force awarded Shreveport-based Stephenson Stellar a $98 million sole-source engineering support IDIQ at Barksdale Air Force Base to address areas of high interest affecting the national security posture of Air Force Global Strike Command, covering the nuclear bomber and ICBM missions through May 2031.