U.S. Air Force
Every GovConFeed story on U.S. Air Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Leidos Wins $475M Air Force Contract to Sustain F-16 Avionics Worldwide
Leidos secured a $475M contract from Hill Air Force Base to provide product support integration for the F-16 Avionics Intermediate Shop program, covering USAF and allied air forces globally.
-
Awards
Air Force to Begin FAMM Cruise Missile Production in September, Eyes 28,000 Units Over Five Years With Anduril and CoAspire
Air Force Chief of Staff Gen. Kenneth Wilsbach confirmed September 2026 production start for the Family of Affordable Mass Missiles, with FY2026 funding already covering the first 1,000 rounds and a five-year plan to procure nearly 28,000 weapons.
-
Policy
GAO: Air Force Tanker Fleet Missed Readiness Targets for 6 Straight Years as KC-46 RVS Fix Slips to 2028
A new GAO report finds the KC-135 and KC-46A both failed mission-capable-rate goals every year from FY2019 through FY2025, driven by parts shortages, inexperienced maintainers, and a KC-46 Remote Vision System redesign now pushed to early 2028.
-
Policy
Senate Panel Clears NDAA Provision Allowing Space Force to Fold SDA and Space RCO Into Unified Acquisition Structure
The Senate Armed Services Committee's FY2027 NDAA removes separate statutory requirements for SDA and Space RCO, giving the Air Force Secretary flexibility to fold both into Space Force's new Portfolio Acquisition Executive framework.
-
Awards
SAIC Wins $192M Air Force ABMS Contract to Build CJADC2 Digital Infrastructure Network
SAIC secured a $192 million multiple-award IDIQ to develop digital infrastructure for the Air Force's Advanced Battle Management System, supporting CJADC2 across optical transport, software-defined WAN, cross-domain solutions, and AI-enabled cloud infrastructure from tactical to strategic domains.
-
Awards
Army Posts FRAM II RFP for Apache, Black Hawk, and Chinook Fleet Maintenance at Fort Novosel — Proposals Due July 14
The Army posted the Fort Rucker Aviation Maintenance II solicitation June 9, covering full maintenance of AH-64E Apache, CH-47F Chinook, UH-60M Black Hawk, and UH-72A Lakota fleets at Fort Novosel, Alabama. Proposals are due July 14. Incumbent M1 Support Services is bridging under a $601M modification.
-
Awards
Air Force Awards $4 Billion Base Operations IDIQ to 19 Companies at AETC Training Bases
The Air Force awarded a $4 billion, 10-year base operations IDIQ to 19 companies at 11 AETC training bases on June 8, 2026. The vehicle, managed by the 338th Enterprise Sourcing Squadron at JBSA-Randolph, covers 22 service categories and runs through June 2036.
-
Awards
Air Force Awards Kongsberg $241M Sole-Source Contract for Joint Strike Missile Lot 2 Production
The Air Force awarded Kongsberg Defence & Aerospace a $240.9M firm-fixed-price sole-source contract on June 5, 2026, for Lot 2 production of the Joint Strike Missile — covering all-up rounds, containers, test hardware, and support items for the F-35A through November 2028.
-
Awards
Air Force Awards GE Aerospace, Rolls-Royce OTA Contracts for Medium Thrust Class Drone Engine Designs
The U.S. Air Force awarded OTA contracts to GE Aerospace and Rolls-Royce to develop engines for the Medium Thrust Class Autonomous Collaborative Platform, placing AI-piloted drone propulsion in preliminary design review under Propulsion Consortium Initiative 2.0.
-
Enforcement
Las Vegas Man Pleads Guilty to Rigging Bids on Nellis and Moody Air Force Projects
Scott G. Srodes, 65, of Las Vegas pleaded guilty to conspiring to rig bids and defraud the U.S. on more than $1.8M in Air Force facility projects at Nellis and Moody AFB. It is the second plea in an ongoing PCSF bid-rigging investigation into military-facility procurement.
-
Awards
Boeing Wins $200M AFRL IDIQ for Aerospace Vehicle Technology R&D
Boeing won a competitively awarded $200M indefinite-delivery/indefinite-quantity contract from the Air Force Research Laboratory for multidisciplinary aerospace vehicle technology research, integration and transition, with work in St. Louis through May 2037.
-
Awards
General Dynamics Mission Systems Wins $106M MUOS Ground-Segment Sustainment Task Order, $294.9M With Options
General Dynamics Mission Systems received a $106 million task order for baseline sustainment and obsolescence support of the MUOS ground segment, with a total value of $294.9 million if all options are exercised, running through May 2031.