L3Harris Technologies
Every GovConFeed story on L3Harris Technologies — contract awards, policy, enforcement, and protests, newest first.
-
Awards
SDA Books $1.75B for 36 Golden Dome Missile-Tracking Satellites With L3Harris, Sierra Space
The Space Development Agency awarded L3Harris $955M and Sierra Space $798M to build 36 Tranche 3 missile-tracking and missile-defense satellites for Golden Dome for America, bringing the Tracking Layer to 104 spacecraft with delivery expected by end of 2028.
-
Awards
MDA Books $499.6M Aeromet Deal to Keep Sensor Aircraft Watching Interceptor Tests
The Missile Defense Agency awarded L3Harris subsidiary Aeromet a 10-year, $499.6M IDIQ to operate, sustain and modernize the airborne sensor aircraft that track missile-defense interceptor flight tests, nearly tripling the ceiling of its 2021 predecessor contract.
-
Awards
L3Harris and Turkey's Skydagger Sign Co-Production Pact to Build FPV Drone Interceptors in the U.S. for Integration Into VAMPIRE Counter-Drone System
L3Harris Technologies and Turkish firm Skydagger signed a June 16 MOU to co-produce first-person-view drone interceptors in the U.S. for integration into L3Harris's VAMPIRE counter-UAS platform, with integration targeted by end of 2026.
-
Awards
L3Harris Lands $495M Army Modification, Pushing Communications Contract Ceiling to $3.8B
The Army added $495 million to an L3Harris communication systems contract, lifting its cumulative face value to roughly $3.8 billion. The award drew one bid via internet solicitation, with work completion estimated for December 1, 2026.
-
Awards
L3Harris Wins $77M Modification for Trident II D5 Flight Test Instrumentation Systems
Strategic Systems Programs awarded L3Harris Technologies — through its Interstate Electronics Corp. subsidiary — a $77.2 million cost-plus modification on May 1 to continue flight test instrumentation support for the Trident II D5 submarine-launched ballistic missile, the backbone of the U.S. and UK sea-based nuclear deterrent.
-
Awards
Space Force Triples Andromeda Ceiling to $6.2B — 14 Firms to Replace GSSAP and SILENTBARKER Spy Satellites
The Andromeda IDIQ, awarded to 14 firms in April 2026 for next-generation geosynchronous surveillance satellites, has seen its ceiling raised from $1.84B to $6.2B. The program replaces GSSAP (run by Space Force) and SILENTBARKER (run jointly with NRO). FY2027 urgency is driving the acceleration.
-
Awards
Raytheon books $441.6M PATRIOT GEM-T modification to replenish stocks consumed in Operation Epic Fury
Modification P00026 to W31P4Q-23-C-0036, awarded April 30 and announced May 1, 2026 — work runs through September 30, 2026 at the Chambersburg, PA plant. Fully funded with FY26 special funds.
-
Awards
L3Harris wins $150M Space Force MOSSAIC contract for ground-system modernization
April 7, 2026 award funds modernization and sustainment of GEODSS ground systems under MOSSAIC — Maintenance of Space Situational Awareness Integrated Capabilities — entering its seventh year of a decade-long effort.
-
Awards
Navy's $18.5B Virginia-class attack submarine contracts — 2 boats + workforce development
Navy awards Up To $18.5B in contracts for 2 Virginia-class attack submarines plus workforce development investments. Continues the demand signal of one Columbia + two Virginia-class submarines per year that the supplier base must meet.