L3Harris Technologies
Every GovConFeed story on L3Harris Technologies — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Navy Stands Up China Lake Tomahawk Warhead Line to Feed Raytheon's $22.9B Ramp-Up
NAWCWD cut the ribbon Nov. 9 on a 300-gallon energetics mixer at China Lake, set to reach Tomahawk warhead production rate around June 2027 under an L3Harris public-private partnership, after filling seven first-article WDU-36/B warheads this fall.
-
Awards
Army Puts Up to $60M Behind L3Harris Ramjet Drone Interceptor for XRC Flight Tests
Army XRC program moves L3Harris into flight testing of a ramjet-powered long-range drone interceptor under a three-year contract worth up to $60 million from DEVCOM AvMC, with full value tied to continued funding.
-
Awards
$55M Army BiNOD Order Sends L3Harris NOVA Night-Vision Goggles to Full-Rate Production
L3Harris received a $55 million Army award to supply NOVA night-vision goggles for the BiNOD program and says it will move directly into full-rate production, six months after the Army picked it as one of several vendors on a seven-year contract worth up to $465 million.
-
Awards
Army Places $63M FWS-I Thermal Sight Order With Leonardo DRS Under Existing IDIQ
The Army placed a $63 million production order with Leonardo DRS for FWS-I thermal weapon sights that link wirelessly to ENVG-B and IVAS helmet displays. The order falls under an existing IDIQ that Army Recognition values at $579 million, with more than $314 million now reported in orders.
-
Awards
$250M Lockheed Order Sends Record GMLRS Rocket Motor Run to L3Harris' New Arkansas Plant
Lockheed Martin awarded L3Harris a $250 million follow-on subcontract for standard-range GMLRS rocket motors, which L3Harris calls the largest quantity in program history. The work goes to its Camden, Arkansas, Arsenal of Freedom plant, slated to open later in 2026.
-
Awards
SDA Books $1.75B for 36 Golden Dome Missile-Tracking Satellites With L3Harris, Sierra Space
The Space Development Agency awarded L3Harris $955M and Sierra Space $798M to build 36 Tranche 3 missile-tracking and missile-defense satellites for Golden Dome for America, bringing the Tracking Layer to 104 spacecraft with delivery expected by end of 2028.
-
Awards
MDA Books $499.6M Aeromet Deal to Keep Sensor Aircraft Watching Interceptor Tests
The Missile Defense Agency awarded L3Harris subsidiary Aeromet a 10-year, $499.6M IDIQ to operate, sustain and modernize the airborne sensor aircraft that track missile-defense interceptor flight tests, nearly tripling the ceiling of its 2021 predecessor contract.
-
Awards
L3Harris and Turkey's Skydagger Sign Co-Production Pact to Build FPV Drone Interceptors in the U.S. for Integration Into VAMPIRE Counter-Drone System
L3Harris Technologies and Turkish firm Skydagger signed a June 16 MOU to co-produce first-person-view drone interceptors in the U.S. for integration into L3Harris's VAMPIRE counter-UAS platform, with integration targeted by end of 2026.
-
Awards
L3Harris Lands $495M Army Modification, Pushing Communications Contract Ceiling to $3.8B
The Army added $495 million to an L3Harris communication systems contract, lifting its cumulative face value to roughly $3.8 billion. The award drew one bid via internet solicitation, with work completion estimated for December 1, 2026.
-
Awards
L3Harris Wins $77M Modification for Trident II D5 Flight Test Instrumentation Systems
Strategic Systems Programs awarded L3Harris Technologies — through its Interstate Electronics Corp. subsidiary — a $77.2 million cost-plus modification on May 1 to continue flight test instrumentation support for the Trident II D5 submarine-launched ballistic missile, the backbone of the U.S. and UK sea-based nuclear deterrent.
-
Awards
Space Force Triples Andromeda Ceiling to $6.2B — 14 Firms to Replace GSSAP and SILENTBARKER Spy Satellites
The Andromeda IDIQ, awarded to 14 firms in April 2026 for next-generation geosynchronous surveillance satellites, has seen its ceiling raised from $1.84B to $6.2B. The program replaces GSSAP (run by Space Force) and SILENTBARKER (run jointly with NRO). FY2027 urgency is driving the acceleration.
-
Awards
Raytheon books $441.6M PATRIOT GEM-T modification to replenish stocks consumed in Operation Epic Fury
Modification P00026 to W31P4Q-23-C-0036, awarded April 30 and announced May 1, 2026 — work runs through September 30, 2026 at the Chambersburg, PA plant. Fully funded with FY26 special funds.