Lockheed Martin
Every GovConFeed story on Lockheed Martin — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Army Commits Up to $3B for Lockheed Martin Sentinel A4 Radar Production
Army Contracting Command awarded Lockheed Martin a framework contract worth up to $2.99 billion for Sentinel A4 air-and-missile-defense radar production and engineering, running through June 2031 as the AESA sensor moves into low-rate production.
-
Awards
$8.4B Army Modification Expands Precision Strike Missile Production Through FY2032
Army Contracting Command awarded Lockheed Martin an $8.4 billion modification on June 23, 2026 to expand Precision Strike Missile production, lifting the contract ceiling to roughly $13.3 billion and extending the ordering period through fiscal 2032.
-
Awards
Pentagon Locks In $35.3B Seven-Year THAAD Deal to Quadruple Interceptor Production Through FY2032
The Missile Defense Agency awarded Lockheed Martin a $35.3B seven-year undefinitized contract to quadruple THAAD interceptor production from 96 to 400 per year through FY2032, the first major multiyear procurement under the Department of War's Acquisition Transformation Strategy.
-
Awards
Army Selects Anduril and Palantir to Lead NGC2 Common Data Layer, Moving Command-and-Control Modernization From Prototype to Production
The Army announced Anduril Industries as lead for the Next Generation Command and Control common data layer baseline, partnering with Palantir and Raft to provide an edge-to-cloud data mesh that will scale to all 11 Army divisions over five years.
-
Awards
Boeing Beats Lockheed for $2B Space Force Contract to Build Two Next-Generation MUOS Narrowband Satellites
Space Force selected Boeing over Lockheed Martin for a $2 billion fixed-price-incentive contract to design, develop, and produce two Mobile User Objective System Phase II satellites, the first competitive narrowband SATCOM production award Boeing has won from the service.
-
Awards
Lockheed Martin All-Up Rounds Contract Grows $83M to Stockpile Army Hypersonic Conventional Prompt Strike Missiles
Strategic Systems Programs awarded Lockheed Martin Space an $83.18M cost-plus-incentive-fee modification on June 22, 2026, to produce Common Hypersonic All-Up Rounds for U.S. Army stockpile, with work across seven U.S. sites and completion by June 2029.
-
Awards
Space Force Awards Lockheed Martin $514M for Two More GPS IIIF Satellites as Anti-Jam Constellation Grows to 14 Spacecraft
The U.S. Space Force awarded Lockheed Martin $514M to produce GPS IIIF satellites SV23 and SV24, expanding the modernized anti-jam constellation to 14 spacecraft under a 2018 contract with options for up to 22.
-
Awards
Navy Sole-Sources $22M F/A-18 IRST21 Cooling Unit Contract to Meggitt Defense, Sole Supplier for Full-Rate Production
NAVAIR awarded Meggitt Defense Systems a $22.5M sole-source firm-fixed-price contract for F/A-18 IRST21 Environmental Control Unit Weapons Replaceable Assemblies, citing non-competitive procedures. Contract runs through February 2030, drawing FY2025 and FY2026 aircraft procurement funds.
-
Awards
Lockheed Martin Wins $224M SONAR Contract Modification for Navy Engineering and Production Support
NAVSEA awarded Lockheed Martin Rotary and Mission Systems a $223.9M cost-plus-incentive-fee modification to continue engineering design, development, and production support for Navy SONAR systems, with 3% going to Canada via FMS and work running through September 2027.
-
Awards
Air Force Awards Anduril and General Atomics Production Contracts for First Operational CCA Drone Wingmen
Air Force picked Anduril (FQ-44A Fury) and General Atomics (FQ-42A Dark Merlin) for the first CCA production contracts June 17, 2026, bypassing Boeing, Lockheed Martin, and Northrop Grumman. Three production lots target 150 aircraft by decade-end at under $30M per unit.
-
Awards
Sikorsky Wins $525M IDIQ for CH-53K King Stallion Engineering Modernization
Naval Air Systems Command awarded Sikorsky Aircraft a sole-source, not-to-exceed $525 million indefinite-delivery/indefinite-quantity contract for non-recurring engineering, integration, and flight-test support on the CH-53K King Stallion through June 2031, with work split across Stratford, West Palm Beach, Fort Worth, and other U.S. sites.
-
Awards
Lockheed Martin Wins $2.29 Billion Navy IDIQ for F-35 Global Sustainment
The U.S. Navy awarded Lockheed Martin a $2.293 billion cost-plus-incentive-fee IDIQ (contract N00019-26-D-0004) for F-35 Lightning II initial sustainment across all variants, covering Navy, Marine Corps, and allied partner aircraft through 2030.