U.S. Air Force
Every GovConFeed story on U.S. Air Force — contract awards, policy, enforcement, and protests, newest first.
-
Awards
$53.5M Air Force Cyber Defense Contract for the 33rd Cyber Operations Squadron Goes to STS Government Solutions
The Air Force awarded STS Government Solutions a firm-fixed-price contract worth up to $53,470,084 to run cyber defense, network security and information protection for the 33rd Cyber Operations Squadron at JBSA-Lackland. The deal drew 127 offers and runs through Aug. 31, 2030.
-
Awards
$984M E-4B Doomsday Plane Contract Awarded to Small Business Joint Venture Through 2037
The Air Force Life Cycle Management Center awarded Strategic Mission Systems LLC — a joint venture of three small businesses — a $984 million IDIQ to sustain the E-4B National Airborne Operations Center through June 2037, covering software sustainment, cybersecurity, and field service at Offutt AFB and two other locations.
-
Awards
Air Force Opens $399M AMRAAM D4/C9 Development for 31 Allied Nations
Air Force Life Cycle Management Center awarded Raytheon a $398.7M undefinitized contract action on June 23, 2026, to begin AMRAAM D4/C9 variant development, covering system requirements and preliminary design reviews for a 31-nation foreign military sales program with $104.1M obligated at award.
-
Awards
Air Force Taps Colorado Firm for $20.6M On-Orbit Thruster Experiment Program Through 2036
Air Force Test Center awards Geneva Technologies a $20.6M cost-plus contract to fly novel space thrusters and conduct on-orbit resiliency experiments through 2036, supporting Space Force satellite survivability goals.
-
Awards
$66.6M DLA Contract Locks In Extreme-Environment Combat Ration Enhancements for All Four Military Branches Through 2031
Defense Logistics Agency Troop Support awarded Baxters North America a $66.6M five-year fixed-price IDIQ for Modular Operational Ration Enhancement packages serving Army, Navy, Air Force, and Marine Corps personnel in extreme cold and hot environments through June 2031.
-
Awards
Boeing Wins $121M Navy Order to Install Increment 3 Block 2 Upgrades on Six U.S. and Three Australian P-8A Poseidon Aircraft
The Navy awarded Boeing a $121M cost-plus-fixed-fee order on June 22, 2026, for Increment 3 Block 2 A-kit retrofits on six U.S. Navy and three Royal Australian Air Force P-8A Poseidon maritime patrol aircraft, with work running through May 2029.
-
Awards
Air Force Awards Anduril and General Atomics Production Contracts for First Operational CCA Drone Wingmen
Air Force picked Anduril (FQ-44A Fury) and General Atomics (FQ-42A Dark Merlin) for the first CCA production contracts June 17, 2026, bypassing Boeing, Lockheed Martin, and Northrop Grumman. Three production lots target 150 aircraft by decade-end at under $30M per unit.
-
Awards
Dell Federal Secures $1.44B Air Force Call Order to Renew Microsoft 365 Enterprise Licenses Through 2029
Dell Federal Systems was awarded a $1,437,934,084 firm-fixed-price call order on June 15, 2026, to renew Microsoft 365 enterprise licenses for the Air Force through April 30, 2029. The Air Force Life Cycle Management Center issued the sole-source award under BPA N66001-26-A-0051.
-
Awards
Top Flight Aerostructures Wins $53M DLA Contract for B-1 Trailing Edge Components
Top Flight Aerostructures Inc. of Dallas, Georgia has been awarded a $53,078,535 firm-fixed-price IDIQ contract by the Defense Logistics Agency for B-1 Lancer aircraft trailing edge components, with a three-year performance period running through June 2029.
-
Awards
General Atomics-Integrated Intelligence Wins $49.7M AFRL Contract for GALAWAR Spectrum Geolocation Program
The Air Force Research Laboratory has awarded General Atomics-Integrated Intelligence Inc. a cost-plus-fixed-fee contract worth $49.7M for GALAWAR spectrum geolocation research at Wright-Patterson AFB, advancing AFRL's Sensors Directorate electromagnetic superiority programs.
-
Awards
Air Force Awards Nextgen Federal $14M to Embed AI Into BIFROST Weather Portal
The U.S. Air Force awarded Nextgen Federal a sole-source cost-type contract worth up to $14,081,185 to integrate artificial intelligence and machine learning capabilities into the BIFROST weather data command and control portal used by Air Force weather operations.
-
Awards
Leidos Wins $475M Air Force Contract to Sustain F-16 Avionics Worldwide
Leidos secured a $475M contract from Hill Air Force Base to provide product support integration for the F-16 Avionics Intermediate Shop program, covering USAF and allied air forces globally.