U.S. Navy
Every GovConFeed story on U.S. Navy — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Navy Awards Jacobs and Wiley|Wilson JV Parallel $249M A-E IDIQs for NAVFAC Washington Portfolio
NAVFAC Washington awarded two competing $249M architecture-engineering IDIQs on June 18, 2026 — one to Jacobs Government Services and one to a Wiley|Wilson/Burns & McDonnell JV — creating $498M in design capacity for Navy and Marine Corps installations across the national capital region through 2031.
-
Awards
Navy Sole-Sources $22M F/A-18 IRST21 Cooling Unit Contract to Meggitt Defense, Sole Supplier for Full-Rate Production
NAVAIR awarded Meggitt Defense Systems a $22.5M sole-source firm-fixed-price contract for F/A-18 IRST21 Environmental Control Unit Weapons Replaceable Assemblies, citing non-competitive procedures. Contract runs through February 2030, drawing FY2025 and FY2026 aircraft procurement funds.
-
Awards
Lockheed Martin Wins $224M SONAR Contract Modification for Navy Engineering and Production Support
NAVSEA awarded Lockheed Martin Rotary and Mission Systems a $223.9M cost-plus-incentive-fee modification to continue engineering design, development, and production support for Navy SONAR systems, with 3% going to Canada via FMS and work running through September 2027.
-
Awards
NAVFAC Washington Splits $498M A-E IDIQ Between Jacobs and Wiley|Wilson-Burns & McDonnell for DC-Area Naval Facility Design
NAVFAC Washington split a $498M architectural-engineering IDIQ between Jacobs Government Services and the Wiley|Wilson-Burns & McDonnell joint venture on June 18, 2026, awarding each firm a $249M ceiling for DC-area naval facility design through June 2031.
-
Awards
Boeing Wins $880M Navy IDIQ to Train P-8A Poseidon Crews Across Nine Allied Nations
The Navy awarded Boeing an $880M IDIQ on June 18, 2026, for P-8A Poseidon aircrew and maintenance training systems covering 12 locations across nine allied nations. The five-year contract runs through June 2031 and spans Australia, the UK, Germany, South Korea, Norway, New Zealand, Canada, and Singapore.
-
Awards
HII Wins $418M Navy IDIQ for Aircraft Carrier and Amphibious Ship Elevator Maintenance Through 2031
Huntington Ingalls Industries Mission Technologies Corp. was awarded a $417.7M cost-plus-fixed-fee IDIQ by NAVSEA on June 15, 2026, for elevator support unit maintenance and repair on U.S. Navy aircraft carriers and amphibious ships through June 2031.
-
Awards
General Dynamics Wins $116.6M Navy Modification for MK 54 Lightweight Torpedo Sonar Kits
Naval Sea Systems Command awarded General Dynamics Mission Systems a $116.6M contract modification on June 17, 2026 to produce MK 54 MOD 1 sonar kits, exercise instrumentation, and spares through April 2029.
-
Awards
Parsons Lands $184M Navy Single-Award IDIQ to Modernize Intelligence Carry-On Program at Tactical Edge
Parsons Corporation won a $184 million single-award IDIQ from the Department of the Navy on June 15, 2026, to support the Intelligence Carry-On Program — a ruggedized, portable workstation designed to improve battlespace awareness and readiness at the tactical edge.
-
Awards
Sikorsky Wins $525M IDIQ for CH-53K King Stallion Engineering Modernization
Naval Air Systems Command awarded Sikorsky Aircraft a sole-source, not-to-exceed $525 million indefinite-delivery/indefinite-quantity contract for non-recurring engineering, integration, and flight-test support on the CH-53K King Stallion through June 2031, with work split across Stratford, West Palm Beach, Fort Worth, and other U.S. sites.
-
Awards
Bechtel Plant Machinery Wins $128M Modification for Naval Nuclear Propulsion Components
The U.S. Navy has awarded Bechtel Plant Machinery Inc. a $128.4 million cost-plus-fixed-fee modification for naval nuclear propulsion components, with work performed in Monroeville, Pennsylvania under the Naval Nuclear Propulsion Program.
-
Awards
Navy Awards $23.4M for 50 Blackbeard Hypersonic Prototypes in Latest MACE Expansion
The U.S. Navy has awarded Castelion Corp. $23,350,000 for 50 pre-production Blackbeard hypersonic prototype vehicles under the MACE program, advancing affordable hypersonic strike capability for fleet strike missions.
-
Awards
NIWC Pacific Awards $178M Cybersecurity and Systems Lifecycle IDIQ to Ten Small Businesses
Naval Information Warfare Center Pacific has awarded a $178.4M small-business IDIQ to ten firms, including Dark Wolf Solutions, for cybersecurity, command and control integration, and systems lifecycle support across Navy and Marine Corps programs.