All articles
-
Awards
Raytheon books $441.6M PATRIOT GEM-T modification to replenish stocks consumed in Operation Epic Fury
Modification P00026 to W31P4Q-23-C-0036, awarded April 30 and announced May 1, 2026 — work runs through September 30, 2026 at the Chambersburg, PA plant. Fully funded with FY26 special funds.
-
Awards
Marvin Engineering wins $138.2M Air Force requirements contract for AMRAAM launchers and power supplies (FMS)
May 1, 2026 firm-fixed-price requirements contract — components for fighter aircraft that carry and release AIM-120 AMRAAM, all for Foreign Military Sales partners. 10-year period of performance.
-
Awards
AAR books $305M follow-on Navy/Marine Corps C-40A clipper sustainment contract
Long-running C-40A (Navy version of Boeing 737-700) maintenance, supply, and engineering support — extends AAR's incumbent position on the Navy's logistics-airlift fleet.
-
Awards
Navy awards $325.9M MAC to eight shipbuilders for up to 474 composite rigid-hull inflatable boats
April 30 award announced May 1, 2026 — total potential value $650.1M over 10 years. Spreads small-craft procurement across multiple yards instead of a single supplier.
-
Awards
Boeing books $37.8M modification for F-15 Saudi advanced aircrew training device Phase II
May 1, 2026 firm-fixed-price modification keeps contractor logistics support flowing on the Royal Saudi Air Force F-15SA training simulator program. Cumulative contract value now $144.3M.
-
Awards
Lockheed Martin books $27.5M Space Fence modification — keeps the LEO-tracking radar operational
May 1, 2026 modification on AN/FSY-3 — the Kwajalein-based S-band radar that detects, tracks, and catalogs space objects for the Space Force's space situational awareness mission.
-
Awards
NASA awards Development Seed $76M IDIQ for ODSI data engineering, AI/ML, and informatics support
Performance-based IDIQ kicks off May 15, 2026 — two-year base plus three one-year options through June 2031. Covers system architecture, AI/ML, and operations for NASA's Open Data Science Initiative.
-
Awards
Raytheon books $206M Navy JPALS contract to add M-Code GPS to carrier landings
Late-April 2026 award. Cost-plus-incentive-fee through April 2030 funds design, integration, test, and four engineering development models adding M-Code GPS to the AN/USN-3(V)1 Joint Precision Approach and Landing System.
-
Awards
KBR retains $200M DOT Volpe Center contract for AI-led transportation modernization
Recompete win announced April 27, 2026. KBR's Mission Technology Solutions takes a single-award, five-year BPA (TTEMS) via GSA MAS covering AI/ML, modeling and simulation, web frameworks, and analytics across FAA, FHWA, FMCSA, NHTSA, DoW.
-
Awards
Iron Bow lands $100M Air Force IT modernization contract — software modernization support services
Firm-fixed-price contract from the 10th Contracting Squadron at the Air Force Academy, Colorado. $100M for software modernization support — consolidated hardware/software for training and asset management. Through April 2027 across CONUS and OCONUS sites.
-
Awards
Leidos' Dynetics wins $617.2M Army order for 53 IFPC Inc 2 systems — total program ~$1.2B
April 23, 2026 award via Leidos' Dynetics subsidiary funds 53 Indirect Fire Protection Capability Increment 2 systems plus continued R&D through 2029. Combined with $356M from July/Sept 2025, total now ~$1.2B in production contracts.
-
Awards
USDA signs $300M Palantir BPA for National Farm Security Action Plan — anti-fraud, foreign-influence screening
April 22, 2026 BPA advances USDA's National Farm Security Action Plan (NFSAP). Built on the Landmark platform, scope spans Farm Production and Conservation systems, 'One Farmer, One File,' and screens for fraud / foreign influence. Work began 2025; full rollout by 2028.
Page 110 of 121