All articles
-
Awards
Army Puts Up to $60M Behind L3Harris Ramjet Drone Interceptor for XRC Flight Tests
Army XRC program moves L3Harris into flight testing of a ramjet-powered long-range drone interceptor under a three-year contract worth up to $60 million from DEVCOM AvMC, with full value tied to continued funding.
-
Awards
$160M Cyber Command Task Order Puts Leidos Inside Full-Spectrum Cyber Operations
Leidos will help U.S. Cyber Command plan and conduct offensive and defensive cyber operations under a $160 million OASIS+ task order, a win the company tied to its 2025 Kudu Dynamics acquisition.
-
Enforcement
Cleared CIA Contractor Arrested Over Alleged Leaks to a Substack Writer
FBI arrested Ian Brinksman, a Top Secret/SCI-cleared systems-integration developer for a contractor to a U.S. intelligence agency, on charges he transmitted national defense information to a romantic partner who runs a Substack publication. The case spotlights insider-risk exposure for cleared contractor staff.
-
Policy
SBA Puts $7M Into Nine New Regional Innovation Clusters, Five Focused on Defense
SBA awarded more than $7 million to create nine new Regional Innovation Clusters, five of them defense-focused, bringing the network to 12 after DOGE cuts. The two-year contracts skip the AI and cyber focus of the 2025 solicitation, and the White House's initial FY2027 budget zeroed out the program.
-
Awards
Navy Taps Radiant's Kaleidos Microreactor for NWS Crane, Indiana's First Power Reactor
The Navy picked Radiant Industries to build a 1-MW Kaleidos prototype microreactor at Naval Weapons Station Crane through the Army's Janus Program, with installation due by September 2028. It would be Indiana's first power-producing reactor.
-
Protests
Navy's $1.5B NAVFAC Design-Build Pool: Encon Desbuild Protest Dismissed as Untimely Over Debriefing Label
GAO dismissed Encon Desbuild JV4's protest of its phase-one exclusion from a $1.5B NAVFAC small business design-build IDIQ pool as untimely. The phase-one debriefing was not a required debriefing, so GAO never ruled on the past performance challenge.
-
Awards
$3.5M Air Force Bet on Natilus KONA Targets 'Sub-Tactical' Pacific Airlift
The Air Force is funding $3.5M for Natilus's KONA blended-wing freighter, an optionally manned aircraft carrying just over 8,000 lb for 800 nm, aimed at the gap between converted Cessnas and the C-130 for dispersed Indo-Pacific logistics. Full-scale flight testing is slated for late 2027 or early 2028.
-
Awards
$1.37M Buys Space Force Its First Operational Commercial Space Reserve, Six SDA Firms In
Space Systems Command awarded the first operational Commercial Augmentation Space Reserve contracts to six space domain awareness firms, including LeoLabs, Slingshot and Anduril, worth $1.37 million total, while shutter-control and indemnification terms remain unresolved.
-
Awards
$75M MDA Award Sends Long Wall's Cyclops Low-Cost Interceptor Into Flight Testing
Long Wall says MDA awarded it $75 million to finish flight testing its self-funded Cyclops midcourse interceptor, a mass-producible design sized to fit a shipping container, and that it will match the award with $75 million of its own money.
-
Protests
$185M Navy Security and IT Support Award Stays With HII as GAO Flags Apparent AI-Fabricated Citations
GAO rejected Business Integra's challenge to HII Mission Technologies' $185M Navy security and IT support award, upholding the Navy's key proposal weaknesses and warning that the protester's erroneous citations bore the hallmarks of unverified AI use. Future filings citing nonexistent authority may draw sanctions.
-
Awards
Navy Puts Applied Intuition AI Sensor Fusion on Five Arleigh Burke Destroyers in $25M Award
The Navy awarded Applied Intuition a production contract, reported at $25M, to field its Intelligent Perception System on five Arleigh Burke-class destroyers, fusing camera and infrared feeds, flagging dangerous trajectories and taking over-the-air model updates at sea.
-
Awards
$2.7B Carahsoft BPA Becomes DHS's Single Door for Enterprise Software
DHS has funneled enterprise software buying for 14 components into a $2.7 billion-ceiling Carahsoft BPA covering 70-plus manufacturers, licenses, SaaS subscriptions and support through July 2031, as it seeks volume discounts and department-wide visibility.
Page 15 of 121