All articles
-
Awards
Navy OTA Moves SLCM-N Nuclear Cruise Missile Into Development With Raytheon
The Navy awarded Raytheon an Other Transaction Authority agreement to take the submarine-launched SLCM-N nuclear cruise missile from concept work into development, with Anduril Rocket Motor Systems, Divergent and Williams International on the team. No dollar value was disclosed.
-
Awards
Navy Raises Sabre Systems' NAVAIR Engineering IDIQ Ceiling to $655.6M Two Years After $499.9M Award
Navy adds $155.7M to the labor-cost ceiling of Sabre Systems' NAVAIR systems engineering IDIQ, lifting it from $499.9M to $655.6M with no fee increase, about two years after the small business won the competitive set-aside award. Work runs through April 2030.
-
Awards
$283M in CBP Border Patrol Checkpoint Orders Go to Southwest Valley Constructors Under $10B IDIQ
CBP issued four design-build delivery orders worth $283M to Southwest Valley Constructors for Border Patrol checkpoints in Kingsville, Eagle Pass and Carrizo Springs, Texas, and Indio/Salton City, California, under a $10B shared-ceiling IDIQ. Three of the four orders drew a single offer.
-
Enforcement
Rhombus Power's 'Predictive' AI Sold to SOCOM Faces Whistleblower Suit and Lobbying Questions
SOCOM paid Rhombus Power $10 million over two years for predictive-intelligence tools it later called "not deployable," POGO reporter Kyle Rempfer says. A former executive's lawsuit alleges misuse of classified access, and WestExec advisers face shadow-lobbying questions.
-
Awards
Navy Seeks Shipyards for USS Michael Monsoor Hypersonic Overhaul, a 27-Month Zumwalt Conversion Starting May 2028
NAVSEA will hold a Dec. 9 industry day and has issued two RFIs for the Conventional Prompt Strike depot modernization of USS Michael Monsoor, a May 2028 to August 2030 job that swaps the destroyer's 155mm guns for a 600-long-ton, 12-missile launch module.
-
Awards
SOCOM Orders $197.3M More Boeing MH-47G Chinooks, With Deliveries Running to 2031
U.S. Special Operations Command placed a $197.3 million firm-fixed-price order modification with Boeing's Ridley Park, Pa., plant for MH-47G rotary-wing aircraft, fully obligated from fiscal 2027 Defense-wide and Army aircraft procurement funds, with work running to September 2031. The listing does not give an aircraft count.
-
Policy
$350B Pentagon Reconciliation Bill Is Dead, Coons Says, as Rogers Says Right-to-Repair Won't Make the NDAA
Sen. Chris Coons says Congress is out of time for the $350 billion Pentagon reconciliation bill and the final FY27 defense bill will likely land next year. HASC Chair Mike Rogers sees a path for a $100 billion package but says right-to-repair and an Autonomous Warfare Command will not make this year's NDAA.
-
Policy
CBO: Navy's FY2027 Shipbuilding Plan Would Cost $54 Billion a Year, 41% Above Recent Funding
CBO estimates the Navy's FY2027 30-year shipbuilding plan would cost about $54 billion a year, 41% more in real terms than recent appropriations, and says even record funding levels through 2056 would not buy all 398 ships.
-
Awards
Navy Gives Crowley a $270M Sole-Source Deal to Run Six T-AGOS and T-AGM Ships, Four Times Last Year's Bridge
Military Sealift Command awarded Crowley Government Services a $270.4M sole-source contract to operate and maintain six T-AGOS and T-AGM ships for up to 18 months, about 4.3 times last year's $62.4M bridge for the same fleet.
-
Awards
Trident II D5 Letter Contract Grows to $1.53B Ceiling for Lockheed, From $15.9M July Start
Strategic Systems Programs raised Lockheed Martin's fiscal 2027 Trident II D5 production and deployed systems support letter contract to a $1,533,124,563 not-to-exceed ceiling, sole-source, with work in Utah, Florida, Colorado and Georgia through Sept. 30, 2031.
-
Protests
One Hour Late: ASBCA Tosses Air Force Termination Appeal and Flags AI-Fabricated Citations
The ASBCA dismissed Texas Global Distribution's appeal of an Air Force termination for cause because it arrived at 12:56 a.m. Eastern on day 91, holding filings count in the Board's time zone. The Board also flagged fictitious, apparently AI-generated case citations in the contractor's brief.
-
Awards
$871M F108 Turbine Module IDIQ Splits Tinker Engine Work Between Chromalloy and Global Turbine
The Air Force Sustainment Center at Tinker AFB picked Chromalloy and Global Turbine Services for a maximum $871 million multiple-award IDIQ to remanufacture F108 low-pressure turbine modules for the Air Force and Navy, running through 2031.
Page 1 of 121