All articles
-
Awards
$1.2B Army Deal Arms Lockheed's PrSM Missile to Hit Moving Ships
The Army awarded Lockheed Martin $1.2 billion in a sole-source deal to produce the Precision Strike Missile Increment 2, a variant with a multi-mode seeker that can hit moving ships, as wartime consumption drains PrSM stockpiles by up to 77%.
-
Awards
Army Commits $2.5B to Fix the Engine Supply Chain Squeezing Abrams Readiness
The Army awarded a $2.5 billion ceiling OTA to National Advanced Mobility Consortium to enhance the AGT 1500 engine, months after officials flagged 166 critical and single-source parts -- including a vacuum-forged impeller made by only one U.S. company -- that have been squeezing M1 Abrams readiness.
-
Policy
DoW's Class Deviation Revision 3 Locks In CMMC Pause While Adding Huawei and Drone Bans
A September 3 Department of War memo formalizes the CMMC Phase 2 delay but leaves self-assessment mandatory, while bundling in new bans on Huawei chip suppliers, restricted drone parts, and employee data sales that contractors must now track.
-
Awards
Navy Locks In First MQ-25A Stingray Production Contract at $552 Million
The Navy awarded Boeing a not-to-exceed $552,053,000 modification to build the first three MQ-25A Stingray production aircraft, moving the unmanned refueling drone from development into low-rate production five years behind its original 2024 schedule.
-
Protests
One Missing Letter Sinks Sensis's Secret Service Ad-Contract Protest
GAO dismissed Sensis Inc.'s protest of a five-year Secret Service recruitment advertising contract as untimely after the small business emailed its filing to "[email protected]" instead of the correct "[email protected]" during a GAO filing-system outage.
-
Awards
Army Books Nearly $196M in First REWSI Contracts for AI-Driven EW Sensors
Army Contracting Command awarded Heaviside Industries $99M and Research Innovations Inc. $96.9M for MOTH and Dragonfly electronic warfare sensors, the first production deals under the Army's new REWSI rapid-buying pipeline.
-
Enforcement
DOJ's $245M COVID Loan Fraud Sweep Permanently Bars 870,000 Borrowers From Future SBA Loans
DOJ, SBA, and SBA OIG announced $245 million in intended losses from a summer enforcement surge against PPP and COVID EIDL fraud, while officials disclosed that 870,000 suspected fraudsters have been permanently barred from future federal loans.
-
Policy
Trump Order Forces War Department, VA to Rewrite IT Contracts on Veterans' Records
Executive Order 14426 gives the Department of War and VA 120 days to amend existing IT contracts and add interoperability requirements for military personnel, health, and Service Treatment Records systems, and locks the same requirement into all future contracts in that space.
-
Awards
$113.5M Space Force Award Rebuilds GPS Ground Control for Next-Gen Satellites
Lockheed Martin won $113.5M in Space Force task orders to rebuild GPS ground-system controls and start a three-phase hardware refresh, clearing the way for jam-resistant GPS IIIF satellites while keeping PNT service running for transportation, finance and telecom.
-
Awards
Marine Corps Adds 12 More Rheinmetall Robot Mules for Beach Logistics
American Rheinmetall won a $7.28 million Defense Logistics Agency contract for 12 Mission Master SP autonomous ground vehicles and five amphibious kits, extending Marine Corps Warfighting Laboratory testing of driverless cargo haulers for contested shoreline resupply.
-
Guides
Getting Started in GovCon: A Practical Guide for Small Businesses
Federal contracting looks impenetrable from the outside, but the actual on-ramp is a short, well-documented list of steps. Here's what a small business needs first, in order, with the real government links.
-
Awards
Boeing's Air Force Contract Ceiling Triples to $19.1 Billion on Japan, Israel Arms Sales
A $13.4 billion Foreign Military Sales add pushes Boeing contract FA8609-19-D-0007 from $5.7 billion to $19.1 billion, covering Japan, Israel, and future partner nations, with no funds yet obligated.
Page 34 of 121