All articles
-
Awards
NASA awards Intuitive Machines $180.4M for IM-5 lunar South Pole mission — first Nova-D
March 24, 2026 CLPS task order, fifth award to Intuitive Machines. First requiring the larger Nova-D cargo lander. Targets Mons Malapert near the lunar South Pole; carries seven NASA payloads plus an Australian rover and a Honeybee Robotics rover.
-
Awards
T2S Solutions wins $600M Dept. of War CYBERTRON cybersecurity contract
March 24, 2026 single-award contract: 1-year base + 4 option years. Belcamp, MD-based T2S (founded 2010, acquired by Madison Dearborn in 2023, added Blue Marble in 2025) builds zero-trust, AI cyber, and key-management for DoW.
-
Awards
Kratos books $446.8M Space Force OTA for MEO Missile Warning & Tracking ground segment
March 17, 2026 follow-on Ground Management Integration OTA from Space Systems Command. Kratos leads team including Northrop Grumman, Auria, ASRC Federal Systems Solutions, Rise8. Supports Epoch 1 (12 Millennium sats) and Epoch 2 (10 BAE sats).
-
Awards
MDA raises RTX SM-3 missile contract ceiling to $11.74B — $8.41B increase signals long sustainment tail
March 18, 2026 modification raises the SM-3 sustainment IDIQ ceiling from $3.33B to $11.74B. Period through October 29, 2029. Tucson + Huntsville performance. Contract progression: $722.4M (2020) → $3.33B (2025) → $11.74B (2026).
-
Awards
Raytheon books $2.01B Air Force AEHF terminal modification — nuclear C2 SATCOM through August 2031
March 13, 2026 modification by AFNWC Strategic Communications Division raises cumulative AEHF terminal work to ~$2.97B. Performance in Marlborough, MA and Largo, FL through Aug. 9, 2031. Terminals support nuclear command and control.
-
Awards
Air Force revives E-7A Wedgetail with $2.43B Boeing contracts — Congress reversed program cancellation
March 12, 2026: $2.33B Rapid Prototype Airborne Mission Segment option exercise plus $99.3M radar diminishing-manufacturing-sources work. Cumulative E-7A value now ~$5.01B. Driven by 2026 Consolidated Appropriations Act mandate — Congress reversed Pentagon plans to halt the program.
-
Awards
Raytheon wins $212M Navy AN/TPS-71 ROTHR support — Caribbean + Gulf surveillance through 2031
March 16, 2026 award. 1-year base ($40.25M) + 4 option years for operations/maintenance of AN/TPS-71 ROTHR network — operations control center in Chesapeake VA, three bistatic Doppler radar sites in VA, TX, and Puerto Rico. Counter-narcotics primary mission.
-
Awards
CDC's $1.9B Data Modernization IDIQ Draws Industry Pushback Over Single-Vendor Strategy
CDC's real Data Modernization Initiative is a $1.9B/9-year single-vendor IDIQ via GSA FEDSIM, and the Digital Services Coalition is pushing back on that single-award structure, citing Healthcare.gov as a cautionary example. Replaces the article's original fabricated $800M/multi-award/7-year premise, which didn't match any real CDC procurement.
-
Awards
AFRL awards DCS $95M ASSET contract for multi-domain sensor analysis
March 10, 2026 award to DCS Corporation supporting AFRL's Multi-Domain Sensing Autonomy Division (AFRL/RYA). Follows the 5-year, $48.4M MEAMS contract previously held by DCS subsidiary Infoscitex.
-
Awards
Agile Defense beats 20 competitors for $118M USCIS RAPID dual-vendor contract
April 20, 2026 award via GSA MAS, dual-vendor structure, code-challenge procurement. Five-year potential. Builds on IntelliBridge's prior SPEED-program work (acquired by Agile Defense in 2025). Beat out 20 competitors.
-
Awards
Vibrint books $1.2B across three federal HPC contracts — 125 engineering hires by end of 2026
April 14, 2026 announcement: three seven-year federal contracts totaling $1.2B for high-performance computing lifecycle engineering, modernization, and sustainment. Workforce ramping with 125 hires by end of 2026; 30+ subcontractors and 7 OEMs.
-
Awards
Raytheon books $904.6M Army LTAMDS modification — five units + six spares, work through 2031
April 16, 2026 modification raises cumulative LTAMDS value to ~$5.36B. Andover, MA performance through Aug. 29, 2031. Single bid received via online solicitation; $725.9M FY2026 missile-procurement funds obligated at award.
Page 112 of 121