All articles
-
Policy
House NDAA Would Flip the Default on Defense Data Rights, Forcing Contractors to Prove Ownership
H.R. 8800's Section 861 would make government purpose rights the default for DoD technical data and software, requiring contractors to prove restrictive rights with 'clear and convincing evidence' or lose them automatically.
-
Awards
SpaceX Secures $946M NASA Modification for Three More ISS Crew Missions
NASA added Crew-15, Crew-16 and Crew-17 to SpaceX's Commercial Crew contract in a $946 million sole-source modification, pushing SpaceX's total CCtCap value to $5.92 billion with mission readiness dates in 2027 and 2028.
-
Policy
Trump Signs New Arctic Security Pact With Denmark and Greenland — Two New US Bases, Pituffik Missile-Defense Expansion
Trump signed a new US-Denmark-Greenland security pact replacing the 1951 treaty, authorizing two new American bases at Narsarsuaq and Mestersvig and expansion of Pituffik Space Base's missile-defense mission, while leaving Greenland's sovereignty status reaffirmed but politically unresolved.
-
Awards
Army Hands Small Business Trideum a $400M Deal to Hunt Cyber-Electromagnetic Gaps
The Army awarded Huntsville small business Trideum Corp. a $400 million IDIQ to find vulnerabilities in cyber electromagnetic activities, an eight-year ceiling contract announced Sept. 22, 2026.
-
Policy
GSA Proposes Moving Federal Supply Schedule Ordering Rules Out of the FAR and Into New GSAR Part 538
GSA's Sept. 22 proposed rule would relocate Federal Supply Schedule ordering procedures from FAR Subpart 8.4 to a new GSAR Part 538, part of a FAR Council overhaul that also strips FSS language out of FAR Part 8 entirely.
-
Enforcement
Trump's FBI Shut Down a $900,000 Pay-to-Play Probe Into Defense Contractor Navatek
The FBI's elite public-corruption squad was building a case on Navatek's political donations to more than a dozen lawmakers when Director Kash Patel dismantled the unit, closing the investigation before any charges were filed.
-
Awards
Navy Books $271.2M to Rebuild Newport's Coast Guard Cutter Pier
Skanska will rebuild Naval Station Newport's condemned Pier 1 into a 1,000-foot cutter homeport, funded partly by soon-expiring FY2022 dollars, as Sen. Jack Reed touts the four-berth facility alongside NOAA's nearby relocation.
-
Policy
State Department Clears $2.3B Sale of 21 UH-60M Black Hawks to Norway, Sikorsky as Prime
DSCA notified Congress of a $2.3B Foreign Military Sale equipping Norway's Army and Special Operations Forces with 21 UH-60M Black Hawks, engines, countermeasures and radios, with Sikorsky as prime contractor.
-
Awards
$41.5M Navy Contract Extends Industrial-Base Monitoring Software to Air, Formerly Govini
The Navy awarded a $41.5 million sole-source contract to Poplicus Inc., maker of the Ark platform now rebranding from Govini to Air, extending industrial-base monitoring and supplier-risk software through 2029.
-
Policy
SBA Size Standard Overhaul Draws 67,000 Comments, Mostly Opposed, as Window Closes
SBA's proposal to reset small-business size standards across 338 industries drew 67,220 public comments and an 8-to-1 opposition ratio, with a House committee leader and SBA's own Advocacy office on opposite sides as the comment window closed.
-
Awards
$300M Air Force Recompete Keeps CAE Training C-130H Aircrews Through 2035
The U.S. Air Force awarded CAE USA a $300 million competitive recompete contract extending its role as C-130H aircrew training provider through 2035, covering instruction, sustainment and cybersecurity upgrades for Reserve and Guard aircrews at Little Rock AFB and four other bases.
-
Awards
Hanwha Raises Pine Bluff Arsenal Investment to $2.2 Billion, Opens First U.S. Munitions Campus Building
Hanwha Defense USA cut the ribbon on its Pine Bluff Arsenal headquarters and raised its planned munitions campus investment to $2.2 billion and nearly 400 jobs, up sharply from March's $1.3 billion pledge.
Page 30 of 121