All articles
-
Enforcement
FBI Skipped Its Own Cost Check on $229M Redstone Arsenal Contract, DOJ Audit Finds
A DOJ OIG audit found the FBI never prepared a required cost estimate for a $229M Innovation Center contract at Redstone Arsenal, let subcontractors help pick which of their own workers got interviewed for wage compliance, and did not check a self-performance rule until auditors flagged it.
-
Awards
Pentagon's Lockheed JASSM/LRASM Missile Contract Crosses $10 Billion for First Time
A $825.98 million Air Force modification pushes Lockheed Martin's bulk JASSM and LRASM missile contract past $10.48 billion, as planned lot quantities grow to 23,095 weapons amid Indo-Pacific strike demand.
-
Awards
$74.8 Million Contract Builds a Stealth-Check Hangar for B-21s at Whiteman AFB
Conti Federal Services won a $74.8 million Army Corps contract to build a radio-frequency hangar at Whiteman AFB that verifies the B-21 Raider's radar-evading skin stays intact, extending a facility model the firm first built at Ellsworth AFB.
-
Enforcement
Former NAVWAR Official Sentenced to Six Years for Steering Hundreds of Millions in Navy Contracts for Bribes
A federal judge sentenced former NAVWAR official James Soriano to six years in prison after he pleaded guilty to a bribery scheme running from 2014 to 2019 that let defense contractors draft their own procurement paperwork in exchange for steak dinners, championship tickets, and $2,000 a month in cash routed through a family friend's paycheck.
-
Awards
Army Locks In $4.84 Billion Northrop Grumman Deal to Keep Building Helicopter Missile Jammers Through 2035
The Army awarded Northrop Grumman a $4.84 billion IDIQ, the sole bid received, to keep producing the CIRCM laser countermeasure that protects Apache, Black Hawk and Chinook crews from infrared-guided missiles through September 2035.
-
Policy
Pentagon's $10 Million Pricing Mandate Splits From Hegseth's Own Reform Push
A Pentagon memo demanding full cost and pricing transparency on contracts as small as $10 million, reaching every tier of the supply chain, has drawn criticism for undercutting the administration's own acquisition-reform push and reversing a threshold Congress just raised in the FY2026 NDAA.
-
Protests
Space Force Ordered to Kill LAAFB Task Order Under $5.7B EITaaS Contract
GAO sustained Ares Enterprise's protest, finding a Los Angeles Air Force Base IT task order under the $5.7B EITaaS BPA far exceeded the contract's actual scope, and ordered the Space Force to terminate Vision's order and recompete the work.
-
Awards
DLA Books $496.85M Fresh-Produce Deal With Louisville's What Chefs Want
Creation Gardens Inc., doing business as What Chefs Want, won a five-year Defense Logistics Agency IDIQ worth up to $496,849,673 to supply fresh fruits and vegetables to the Army, Air Force, and USDA, beating two competitors in Philadelphia.
-
Policy
CMMC Phase 2 Suspension Goes DoD-Wide as Pentagon Also Shields Alibaba From Blacklist Rule
A DoD class deviation suspends CMMC Phase 2 third-party assessments across all military branches and, in the same document, temporarily waives the Section 1260H "Chinese military company" prohibition for Alibaba under a federal court order.
-
Enforcement
ICE Extends Amentum's $776 Million Camp East Montana Contract Without Bidding
ICE gave Amentum a no-bid, 12-month, $776 million extension to keep running the Camp East Montana detention facility, despite a GAO audit finding $19 million in unused spending and an active fraud lawsuit against the company.
-
Awards
$345M Task Order Puts ManTech Inside Navy's Crane Cyber Shop
ManTech won a five-year, $345 million Navy task order for cyber and C3I research at NSWC Crane, issued through the IAC MAC vehicle by the Air Force's 774th Enterprise Sourcing Squadron and following the firm's $197M Crane radar contract from July.
-
Awards
MDA Locks In Northrop Grumman for $508.5M Missile Target Contract Through 2035
MDA awarded Northrop Grumman a $508.5M sole-source follow-on contract for missile defense target flight tests, locking in the company as sole supplier through 2035 with no competing offers considered.
Page 36 of 121