Northrop Grumman
Every GovConFeed story on Northrop Grumman — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Army Puts Up to $60M Behind L3Harris Ramjet Drone Interceptor for XRC Flight Tests
Army XRC program moves L3Harris into flight testing of a ramjet-powered long-range drone interceptor under a three-year contract worth up to $60 million from DEVCOM AvMC, with full value tied to continued funding.
-
Awards
$3.5M Air Force Bet on Natilus KONA Targets 'Sub-Tactical' Pacific Airlift
The Air Force is funding $3.5M for Natilus's KONA blended-wing freighter, an optionally manned aircraft carrying just over 8,000 lb for 800 nm, aimed at the gap between converted Cessnas and the C-130 for dispersed Indo-Pacific logistics. Full-scale flight testing is slated for late 2027 or early 2028.
-
Awards
$75M MDA Award Sends Long Wall's Cyclops Low-Cost Interceptor Into Flight Testing
Long Wall says MDA awarded it $75 million to finish flight testing its self-funded Cyclops midcourse interceptor, a mass-producible design sized to fit a shipping container, and that it will match the award with $75 million of its own money.
-
Awards
Navy Gets First C-130J-30 for E-130J Phoenix II, Starting E-6B TACAMO Replacement
Lockheed Martin delivered the first C-130J-30 for the Navy's E-130J Phoenix II on Oct. 15. Northrop Grumman will convert it for the TACAMO nuclear submarine communications mission, with 31 E-130Js planned to replace 16 E-6Bs.
-
Awards
$21M Army IBCS Order Swaps Command Tent for Northrop Expandable Van
Army taps Northrop Grumman for a $21M IBCS variant that swaps the command tent for a protected expandable van; two manufacturing prototypes with six operator and four staff stations are due by June 2027, backed by $10M+ of company cost-sharing.
-
Awards
$1.7B Ceiling on Navy SEWIP Block II Order Keeps Lockheed Building SLQ-32(V)6
Navy gave Lockheed Martin a $209M firm-fixed-price modification to build AN/SLQ-32(V)6 SEWIP Block II electronic warfare systems through 2029, with options to about $1.71B, ahead of a potential $7.13B multiple-award AN/SLQ-32 contract.
-
Awards
Navy Picks Boeing for F/A-XX Carrier Fighter in $20B-Plus Development Deal
The Pentagon says the F/A-XX full-scale development contract is worth more than $20B. Boeing will build the Navy's first sixth-generation carrier fighter, its second such win after the Air Force F-47, and outlets differ on why it beat Northrop Grumman.
-
Awards
Northrop's F-16 Jamming Suite Tops $1.9 Billion as Air Force Funds Low-Rate Production
Northrop Grumman's $87.4 million production award pushes its F-16 jamming suite contract past $1.9 billion, funding low-rate production of a system in flight test since 2024 and backed by a congressionally funded push to field it across the fleet.
-
Awards
Federal Contract Spending Is Up 22.5% Through May. Nearly a Third of the Increase Is at Homeland Security.
A GovConFeed analysis of USAspending.gov records finds agencies obligated $520.9 billion on contracts from October through May, $95.8 billion more than in the same eight months a year earlier. Customs and Border Protection went from $1.9 billion to $25.7 billion.
-
Awards
SDA Books $1.75B for 36 Golden Dome Missile-Tracking Satellites With L3Harris, Sierra Space
The Space Development Agency awarded L3Harris $955M and Sierra Space $798M to build 36 Tranche 3 missile-tracking and missile-defense satellites for Golden Dome for America, bringing the Tracking Layer to 104 spacecraft with delivery expected by end of 2028.
-
Awards
Army Corps Books Bryan Construction for $54.8M B-21 Shelters as Ellsworth Bed-Down Accelerates
The Army Corps of Engineers awarded Bryan Construction $54.8M to build B-21 West Alert Apron shelters at Ellsworth AFB, another in the firm's series of B-21 infrastructure contracts at the base ahead of the bomber's 2027 arrival.
-
Awards
NASA's $30M Katalyst Contract Sends Robotic Servicer to Rescue Decaying Swift Telescope
A Katalyst Space servicer named LINK launched July 3 on a Northrop Grumman Pegasus XL rocket to rendezvous with and reboost NASA's decaying Neil Gehrels Swift Observatory, under a $30 million SBIR Phase III contract awarded in September 2025.