RTX (Raytheon)
Every GovConFeed story on RTX (Raytheon) — contract awards, policy, enforcement, and protests, newest first.
-
Awards
Space Force Awards $3.2 Billion to 12 Companies to Prototype Golden Dome Space-Based Interceptors
Space Systems Command awarded 20 Other Transaction Authority contracts worth up to $3.2 billion to 12 companies — including SpaceX, Anduril, Lockheed Martin, and Northrop Grumman — to develop space-based interceptors for the Golden Dome missile defense architecture.
-
Awards
DMEA Awards $25.4B ATSP V Microelectronics IDIQ to 10 Companies Led by Northrop, Raytheon, Leidos
The Defense Microelectronics Activity awarded 10 companies — including Northrop Grumman, Raytheon, Leidos, L3Harris, Boeing, and Draper Lab — spots on the $25.4B ATSP V IDIQ contract to accelerate American-made microelectronics into military systems over a potential 10-year ordering period.
-
Awards
Raytheon books $441.6M PATRIOT GEM-T modification to replenish stocks consumed in Operation Epic Fury
Modification P00026 to W31P4Q-23-C-0036, awarded April 30 and announced May 1, 2026 — work runs through September 30, 2026 at the Chambersburg, PA plant. Fully funded with FY26 special funds.
-
Awards
Marvin Engineering wins $138.2M Air Force requirements contract for AMRAAM launchers and power supplies (FMS)
May 1, 2026 firm-fixed-price requirements contract — components for fighter aircraft that carry and release AIM-120 AMRAAM, all for Foreign Military Sales partners. 10-year period of performance.
-
Awards
Raytheon books $206M Navy JPALS contract to add M-Code GPS to carrier landings
Late-April 2026 award. Cost-plus-incentive-fee through April 2030 funds design, integration, test, and four engineering development models adding M-Code GPS to the AN/USN-3(V)1 Joint Precision Approach and Landing System.
-
Awards
Raytheon books $213M Navy modification for Zumwalt-class combat systems
April 20, 2026 modification by NAVSEA exercises options on prior Zumwalt combat-systems contract. Funds installation, integration, development, testing, and modernization across six U.S. locations through April 2027.
-
Awards
RTX BBN secures $125M USTRANSCOM IDIQ for JDDE modeling and simulation
Five-year IDIQ awarded late March 2026 (performance April 1, 2026 – March 31, 2031) funds modeling, simulation, and optimization tools supporting Joint Deployment and Distribution Enterprise analysis.
-
Awards
Raytheon books $966.7M MDA modifications for AN/TPY-2 radar — R&D + GaN spares ramp through 2030
Two MDA modifications totaling $966.7M for AN/TPY-2: $773.5M noncompetitive R&D modification plus $193.2M hybrid spares replenishment task order. Performance March 27, 2026 through Oct. 31, 2030.
-
Awards
MDA raises RTX SM-3 missile contract ceiling to $11.74B — $8.41B increase signals long sustainment tail
March 18, 2026 modification raises the SM-3 sustainment IDIQ ceiling from $3.33B to $11.74B. Period through October 29, 2029. Tucson + Huntsville performance. Contract progression: $722.4M (2020) → $3.33B (2025) → $11.74B (2026).
-
Awards
Raytheon books $2.01B Air Force AEHF terminal modification — nuclear C2 SATCOM through August 2031
March 13, 2026 modification by AFNWC Strategic Communications Division raises cumulative AEHF terminal work to ~$2.97B. Performance in Marlborough, MA and Largo, FL through Aug. 9, 2031. Terminals support nuclear command and control.
-
Awards
Raytheon wins $212M Navy AN/TPS-71 ROTHR support — Caribbean + Gulf surveillance through 2031
March 16, 2026 award. 1-year base ($40.25M) + 4 option years for operations/maintenance of AN/TPS-71 ROTHR network — operations control center in Chesapeake VA, three bistatic Doppler radar sites in VA, TX, and Puerto Rico. Counter-narcotics primary mission.
-
Awards
Raytheon books $904.6M Army LTAMDS modification — five units + six spares, work through 2031
April 16, 2026 modification raises cumulative LTAMDS value to ~$5.36B. Andover, MA performance through Aug. 29, 2031. Single bid received via online solicitation; $725.9M FY2026 missile-procurement funds obligated at award.