NASA Sole-Sources $15.4M SR-1 Freedom Reactor Control Box to Aitech
NASA Glenn signed a $15.4 million, one-year, firm-fixed-price sole-source contract with Aitech Defense Systems to design, build and test the Reactor Control Box hardware for SR-1 Freedom, the fission-powered spacecraft set to launch for Mars in late 2028.
Read the story →